{"title":"过度发展的调水工程对鱼类多样性的威胁:以莫迪河为例","authors":"Indira Sharma Bhandari","doi":"10.3126/HN.V24I0.23576","DOIUrl":null,"url":null,"abstract":"The current focus of the country in meeting the increasing demands for energy has led to the increase in number of river water diversion projects for hydropower generation. But the lack of proper guidelines and monitoring mechanism has resulted in rampant licensing of hydropower projects. There are no rules for determining the appropriate number of water diversion projects in a single river. By discussing the case of rampant water diversion projects in the Modi Khola, of western Nepal, this paper raises an important issue of environmental feasibility of projects in the context where, only the engineering and economic feasibility of a project is taken as the basis for project approval and implementation.","PeriodicalId":137822,"journal":{"name":"Hydro Nepal: Journal of Water, Energy and Environment","volume":"29 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-04-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Rampant Development of Water Diversion Projects as a Threat to Fish Diversity: A Case of the Modi Khola\",\"authors\":\"Indira Sharma Bhandari\",\"doi\":\"10.3126/HN.V24I0.23576\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The current focus of the country in meeting the increasing demands for energy has led to the increase in number of river water diversion projects for hydropower generation. But the lack of proper guidelines and monitoring mechanism has resulted in rampant licensing of hydropower projects. There are no rules for determining the appropriate number of water diversion projects in a single river. By discussing the case of rampant water diversion projects in the Modi Khola, of western Nepal, this paper raises an important issue of environmental feasibility of projects in the context where, only the engineering and economic feasibility of a project is taken as the basis for project approval and implementation.\",\"PeriodicalId\":137822,\"journal\":{\"name\":\"Hydro Nepal: Journal of Water, Energy and Environment\",\"volume\":\"29 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-04-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Hydro Nepal: Journal of Water, Energy and Environment\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.3126/HN.V24I0.23576\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Hydro Nepal: Journal of Water, Energy and Environment","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3126/HN.V24I0.23576","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Rampant Development of Water Diversion Projects as a Threat to Fish Diversity: A Case of the Modi Khola
The current focus of the country in meeting the increasing demands for energy has led to the increase in number of river water diversion projects for hydropower generation. But the lack of proper guidelines and monitoring mechanism has resulted in rampant licensing of hydropower projects. There are no rules for determining the appropriate number of water diversion projects in a single river. By discussing the case of rampant water diversion projects in the Modi Khola, of western Nepal, this paper raises an important issue of environmental feasibility of projects in the context where, only the engineering and economic feasibility of a project is taken as the basis for project approval and implementation.