过度发展的调水工程对鱼类多样性的威胁:以莫迪河为例

Indira Sharma Bhandari
{"title":"过度发展的调水工程对鱼类多样性的威胁:以莫迪河为例","authors":"Indira Sharma Bhandari","doi":"10.3126/HN.V24I0.23576","DOIUrl":null,"url":null,"abstract":"The current focus of the country in meeting the increasing demands for energy has led to the increase in number of river water diversion projects for hydropower generation. But the lack of proper guidelines and monitoring mechanism has resulted in rampant licensing of hydropower projects. There are no rules for determining the appropriate number of water diversion projects in a single river. By discussing the case of rampant water diversion projects in the Modi Khola, of western Nepal, this paper raises an important issue of environmental feasibility of projects in the context where, only the engineering and economic feasibility of a project is taken as the basis for project approval and implementation.","PeriodicalId":137822,"journal":{"name":"Hydro Nepal: Journal of Water, Energy and Environment","volume":"29 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-04-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Rampant Development of Water Diversion Projects as a Threat to Fish Diversity: A Case of the Modi Khola\",\"authors\":\"Indira Sharma Bhandari\",\"doi\":\"10.3126/HN.V24I0.23576\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The current focus of the country in meeting the increasing demands for energy has led to the increase in number of river water diversion projects for hydropower generation. But the lack of proper guidelines and monitoring mechanism has resulted in rampant licensing of hydropower projects. There are no rules for determining the appropriate number of water diversion projects in a single river. By discussing the case of rampant water diversion projects in the Modi Khola, of western Nepal, this paper raises an important issue of environmental feasibility of projects in the context where, only the engineering and economic feasibility of a project is taken as the basis for project approval and implementation.\",\"PeriodicalId\":137822,\"journal\":{\"name\":\"Hydro Nepal: Journal of Water, Energy and Environment\",\"volume\":\"29 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-04-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Hydro Nepal: Journal of Water, Energy and Environment\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.3126/HN.V24I0.23576\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Hydro Nepal: Journal of Water, Energy and Environment","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3126/HN.V24I0.23576","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

目前国家对满足日益增长的能源需求的关注,导致了河流引水发电工程的数量增加。但是,由于缺乏适当的指导方针和监督机制,导致水电项目的许可证泛滥。在一条河流中,没有确定适当数量的引水工程的规则。本文通过对尼泊尔西部莫迪科拉(Modi Khola)引水工程泛滥的案例进行讨论,提出了一个重要的项目环境可行性问题,在这种情况下,只有项目的工程和经济可行性才被视为项目批准和实施的基础。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Rampant Development of Water Diversion Projects as a Threat to Fish Diversity: A Case of the Modi Khola
The current focus of the country in meeting the increasing demands for energy has led to the increase in number of river water diversion projects for hydropower generation. But the lack of proper guidelines and monitoring mechanism has resulted in rampant licensing of hydropower projects. There are no rules for determining the appropriate number of water diversion projects in a single river. By discussing the case of rampant water diversion projects in the Modi Khola, of western Nepal, this paper raises an important issue of environmental feasibility of projects in the context where, only the engineering and economic feasibility of a project is taken as the basis for project approval and implementation.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信