{"title":"资源约束项目调度问题的模糊随机系数MODM双层模型","authors":"Zhe Zhang","doi":"10.1109/CSO.2014.123","DOIUrl":null,"url":null,"abstract":"The aim of this paper is to solve resource-constrained projects scheduling problems (RCPSP) with complex hierarchical organization structure. A bi-level MODM model with fuzzy random coefficients is developed for RCPSP under hybrid uncertainty environment. In this model, construction contractor is considered as the upper level decision maker (ULDM) and outsourcing partner is the lower level decision maker (LLDM). The bi-level multiple objective particle swarm optimization algorithm (BL-MOPSO) is designed to obtain the optimal schedule. An illustrative example is given in order to show the effectiveness of the proposed model and algorithm.","PeriodicalId":174800,"journal":{"name":"2014 Seventh International Joint Conference on Computational Sciences and Optimization","volume":"31 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-07-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"8","resultStr":"{\"title\":\"A MODM Bi-level Model with Fuzzy Random Coefficients for Resource-Constrained Project Scheduling Problems\",\"authors\":\"Zhe Zhang\",\"doi\":\"10.1109/CSO.2014.123\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The aim of this paper is to solve resource-constrained projects scheduling problems (RCPSP) with complex hierarchical organization structure. A bi-level MODM model with fuzzy random coefficients is developed for RCPSP under hybrid uncertainty environment. In this model, construction contractor is considered as the upper level decision maker (ULDM) and outsourcing partner is the lower level decision maker (LLDM). The bi-level multiple objective particle swarm optimization algorithm (BL-MOPSO) is designed to obtain the optimal schedule. An illustrative example is given in order to show the effectiveness of the proposed model and algorithm.\",\"PeriodicalId\":174800,\"journal\":{\"name\":\"2014 Seventh International Joint Conference on Computational Sciences and Optimization\",\"volume\":\"31 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-07-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"8\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2014 Seventh International Joint Conference on Computational Sciences and Optimization\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CSO.2014.123\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 Seventh International Joint Conference on Computational Sciences and Optimization","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CSO.2014.123","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 8

摘要

研究具有复杂层次组织结构的资源约束型项目调度问题。建立了混合不确定性环境下RCPSP的模糊随机系数双层MODM模型。在该模型中,将建筑承包商视为上层决策者(ULDM),将外包合作伙伴视为下层决策者(LLDM)。设计了双层多目标粒子群优化算法(BL-MOPSO)求解最优调度。最后通过一个算例验证了所提模型和算法的有效性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A MODM Bi-level Model with Fuzzy Random Coefficients for Resource-Constrained Project Scheduling Problems
The aim of this paper is to solve resource-constrained projects scheduling problems (RCPSP) with complex hierarchical organization structure. A bi-level MODM model with fuzzy random coefficients is developed for RCPSP under hybrid uncertainty environment. In this model, construction contractor is considered as the upper level decision maker (ULDM) and outsourcing partner is the lower level decision maker (LLDM). The bi-level multiple objective particle swarm optimization algorithm (BL-MOPSO) is designed to obtain the optimal schedule. An illustrative example is given in order to show the effectiveness of the proposed model and algorithm.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信