Congcong Li, Juntao Lv, Yudun Li, Dongliang Nan, N. Li, Fangfang Shi
{"title":"特高压变电站主变故障分析与定位","authors":"Congcong Li, Juntao Lv, Yudun Li, Dongliang Nan, N. Li, Fangfang Shi","doi":"10.1109/ACPEE56931.2023.10135810","DOIUrl":null,"url":null,"abstract":"UHV AC transformer is an important equipment in 1000kV UHV substation, and its importance is self-evident. In this paper, the characteristics of fault current in UHV main transformer are analyzed combined with the UHV main transformer trip event caused by abnormal discharge of a combined electric appliance. And the transformer fault recorder is used to realize the quick location of main transformer by phase difference. According to the analysis results, it was determined that the primary fault point was in the B phase gas chamber of 50121 switch on the 500kV side. The gas component test results on site were consistent with the analysis results, which verified the effectiveness of the fault location method.","PeriodicalId":403002,"journal":{"name":"2023 8th Asia Conference on Power and Electrical Engineering (ACPEE)","volume":"47 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Fault Analysis and Location of the Main Transformer in UHV Substation\",\"authors\":\"Congcong Li, Juntao Lv, Yudun Li, Dongliang Nan, N. Li, Fangfang Shi\",\"doi\":\"10.1109/ACPEE56931.2023.10135810\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"UHV AC transformer is an important equipment in 1000kV UHV substation, and its importance is self-evident. In this paper, the characteristics of fault current in UHV main transformer are analyzed combined with the UHV main transformer trip event caused by abnormal discharge of a combined electric appliance. And the transformer fault recorder is used to realize the quick location of main transformer by phase difference. According to the analysis results, it was determined that the primary fault point was in the B phase gas chamber of 50121 switch on the 500kV side. The gas component test results on site were consistent with the analysis results, which verified the effectiveness of the fault location method.\",\"PeriodicalId\":403002,\"journal\":{\"name\":\"2023 8th Asia Conference on Power and Electrical Engineering (ACPEE)\",\"volume\":\"47 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-04-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2023 8th Asia Conference on Power and Electrical Engineering (ACPEE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ACPEE56931.2023.10135810\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2023 8th Asia Conference on Power and Electrical Engineering (ACPEE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ACPEE56931.2023.10135810","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Fault Analysis and Location of the Main Transformer in UHV Substation
UHV AC transformer is an important equipment in 1000kV UHV substation, and its importance is self-evident. In this paper, the characteristics of fault current in UHV main transformer are analyzed combined with the UHV main transformer trip event caused by abnormal discharge of a combined electric appliance. And the transformer fault recorder is used to realize the quick location of main transformer by phase difference. According to the analysis results, it was determined that the primary fault point was in the B phase gas chamber of 50121 switch on the 500kV side. The gas component test results on site were consistent with the analysis results, which verified the effectiveness of the fault location method.