{"title":"在多项目管理环境中将项目分配给项目经理:决策支持模型的试点研究","authors":"P. Patanakul, D. Milosevic, T. Anderson","doi":"10.1109/PICMET.2003.1222800","DOIUrl":null,"url":null,"abstract":"Project assignment is considered one of the most critical project decisions since it influences the performance of projects, and eventually the performance of the organization. Despite its importance, the literature reveals two major gaps on project assignment criteria and methodology. To close these gaps, this study proposes an additional set of project assignment criteria and a systematic methodology for project assignments (DSM). By using the concepts of these case study research combined with a literature review, the important potential criteria for project assignments are identified. These criteria are used in conjunction with the concepts of the analytic hierarchy process (AHP) and the integer programming (IP) to develop a DSM for one company. The DSM is executed and validated with the company's information. As a past of this research project, this paper illustrates the results of the pilot study to be developed for the feasibility study of the DSM development.","PeriodicalId":380910,"journal":{"name":"PICMET '03: Portland International Conference on Management of Engineering and Technology Technology Management for Reshaping the World, 2003.","volume":"36 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2003-07-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"8","resultStr":"{\"title\":\"Assigning projects to project managers in a multiple-project management environment: a pilot study of a decision support model\",\"authors\":\"P. Patanakul, D. Milosevic, T. Anderson\",\"doi\":\"10.1109/PICMET.2003.1222800\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Project assignment is considered one of the most critical project decisions since it influences the performance of projects, and eventually the performance of the organization. Despite its importance, the literature reveals two major gaps on project assignment criteria and methodology. To close these gaps, this study proposes an additional set of project assignment criteria and a systematic methodology for project assignments (DSM). By using the concepts of these case study research combined with a literature review, the important potential criteria for project assignments are identified. These criteria are used in conjunction with the concepts of the analytic hierarchy process (AHP) and the integer programming (IP) to develop a DSM for one company. The DSM is executed and validated with the company's information. As a past of this research project, this paper illustrates the results of the pilot study to be developed for the feasibility study of the DSM development.\",\"PeriodicalId\":380910,\"journal\":{\"name\":\"PICMET '03: Portland International Conference on Management of Engineering and Technology Technology Management for Reshaping the World, 2003.\",\"volume\":\"36 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2003-07-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"8\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"PICMET '03: Portland International Conference on Management of Engineering and Technology Technology Management for Reshaping the World, 2003.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PICMET.2003.1222800\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"PICMET '03: Portland International Conference on Management of Engineering and Technology Technology Management for Reshaping the World, 2003.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PICMET.2003.1222800","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Assigning projects to project managers in a multiple-project management environment: a pilot study of a decision support model
Project assignment is considered one of the most critical project decisions since it influences the performance of projects, and eventually the performance of the organization. Despite its importance, the literature reveals two major gaps on project assignment criteria and methodology. To close these gaps, this study proposes an additional set of project assignment criteria and a systematic methodology for project assignments (DSM). By using the concepts of these case study research combined with a literature review, the important potential criteria for project assignments are identified. These criteria are used in conjunction with the concepts of the analytic hierarchy process (AHP) and the integer programming (IP) to develop a DSM for one company. The DSM is executed and validated with the company's information. As a past of this research project, this paper illustrates the results of the pilot study to be developed for the feasibility study of the DSM development.