D. Bendi, M. Rana, M. Arif, J. Goulding, A. Sawhney
{"title":"印度建筑业的非现场施工准备成熟度模型","authors":"D. Bendi, M. Rana, M. Arif, J. Goulding, A. Sawhney","doi":"10.1108/CI-07-2020-0121","DOIUrl":null,"url":null,"abstract":"Design/Methodology/Approach The research was conducted in three stages. The first stage consisted of a detailed literature review to document 17 different variables affecting the OSC adoption in India. In stage two, 15 semi-structured interviews were carried out where the participants were asked to refine those variables for the Indian context and define what would be different levels of attainment. In the third stage, another set of 5 semi-structure interviews was performed to validate the maturity levels and definitions.","PeriodicalId":221945,"journal":{"name":"Construction Innovation: Information, Process, Management","volume":"342 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-10-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":"{\"title\":\"An off-site construction readiness maturity model for the Indian construction sector\",\"authors\":\"D. Bendi, M. Rana, M. Arif, J. Goulding, A. Sawhney\",\"doi\":\"10.1108/CI-07-2020-0121\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Design/Methodology/Approach The research was conducted in three stages. The first stage consisted of a detailed literature review to document 17 different variables affecting the OSC adoption in India. In stage two, 15 semi-structured interviews were carried out where the participants were asked to refine those variables for the Indian context and define what would be different levels of attainment. In the third stage, another set of 5 semi-structure interviews was performed to validate the maturity levels and definitions.\",\"PeriodicalId\":221945,\"journal\":{\"name\":\"Construction Innovation: Information, Process, Management\",\"volume\":\"342 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-10-07\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"7\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Construction Innovation: Information, Process, Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1108/CI-07-2020-0121\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Construction Innovation: Information, Process, Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/CI-07-2020-0121","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
An off-site construction readiness maturity model for the Indian construction sector
Design/Methodology/Approach The research was conducted in three stages. The first stage consisted of a detailed literature review to document 17 different variables affecting the OSC adoption in India. In stage two, 15 semi-structured interviews were carried out where the participants were asked to refine those variables for the Indian context and define what would be different levels of attainment. In the third stage, another set of 5 semi-structure interviews was performed to validate the maturity levels and definitions.