基于BST的大型货运站调车方案编制

Jiandong Qiu, W. Ren, Minan Tang, F. Yu, Panpan Ma, Panqi Wang
{"title":"基于BST的大型货运站调车方案编制","authors":"Jiandong Qiu, W. Ren, Minan Tang, F. Yu, Panpan Ma, Panqi Wang","doi":"10.1109/DOCS55193.2022.9967724","DOIUrl":null,"url":null,"abstract":"The shunting operation plan is the specific action plan to ensure the shunting of the large freight train depot at the present stage. The shunting district head relies on it to supervise the implementation of shunting operation and lead the shunting work. Due to different shunting equipment and work division in each depot, there will be differences in the methods of preparing plan. Different preparation methods have a great impact on the efficiency of shunting operation, therefore, mainly studying the preparation method of shunting Plan in depot in this paper, i.e. the plan is obtained by the Binary Sorted Tree (BST). Firstly, the BST in line with the shunting of the depot is established; Secondly, the shunting scheme is obtained by traversing the established BST, and the scheme is screened and evaluated to obtain the optimal scheme; Thirdly, using the computer simulate the collection process and generate the shunting plan. Finally, the C++ program is used to output the shunting operation notice.","PeriodicalId":348545,"journal":{"name":"2022 4th International Conference on Data-driven Optimization of Complex Systems (DOCS)","volume":"150 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-10-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Preparation of Shunting Plan for Large Freight Train Depot Based on BST\",\"authors\":\"Jiandong Qiu, W. Ren, Minan Tang, F. Yu, Panpan Ma, Panqi Wang\",\"doi\":\"10.1109/DOCS55193.2022.9967724\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The shunting operation plan is the specific action plan to ensure the shunting of the large freight train depot at the present stage. The shunting district head relies on it to supervise the implementation of shunting operation and lead the shunting work. Due to different shunting equipment and work division in each depot, there will be differences in the methods of preparing plan. Different preparation methods have a great impact on the efficiency of shunting operation, therefore, mainly studying the preparation method of shunting Plan in depot in this paper, i.e. the plan is obtained by the Binary Sorted Tree (BST). Firstly, the BST in line with the shunting of the depot is established; Secondly, the shunting scheme is obtained by traversing the established BST, and the scheme is screened and evaluated to obtain the optimal scheme; Thirdly, using the computer simulate the collection process and generate the shunting plan. Finally, the C++ program is used to output the shunting operation notice.\",\"PeriodicalId\":348545,\"journal\":{\"name\":\"2022 4th International Conference on Data-driven Optimization of Complex Systems (DOCS)\",\"volume\":\"150 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-10-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2022 4th International Conference on Data-driven Optimization of Complex Systems (DOCS)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/DOCS55193.2022.9967724\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 4th International Conference on Data-driven Optimization of Complex Systems (DOCS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/DOCS55193.2022.9967724","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

调车作业计划是现阶段保证大型货运车辆段调车的具体行动计划。调车区长依靠它监督调车作业的实施,领导调车工作。由于每个车辆段的调车设备和分工不同,计划的编制方法也会有所差异。不同的编制方法对调车作业的效率影响很大,因此,本文主要研究的是车辆段调车计划的编制方法,即利用二叉排序树(BST)法获得计划。首先,建立与车辆段调车相适应的BST;其次,通过遍历已建立的BST得到调车方案,并对方案进行筛选和评估,得到最优方案;再次,利用计算机模拟采集过程,生成分路方案。最后,使用c++程序输出分流操作通知。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Preparation of Shunting Plan for Large Freight Train Depot Based on BST
The shunting operation plan is the specific action plan to ensure the shunting of the large freight train depot at the present stage. The shunting district head relies on it to supervise the implementation of shunting operation and lead the shunting work. Due to different shunting equipment and work division in each depot, there will be differences in the methods of preparing plan. Different preparation methods have a great impact on the efficiency of shunting operation, therefore, mainly studying the preparation method of shunting Plan in depot in this paper, i.e. the plan is obtained by the Binary Sorted Tree (BST). Firstly, the BST in line with the shunting of the depot is established; Secondly, the shunting scheme is obtained by traversing the established BST, and the scheme is screened and evaluated to obtain the optimal scheme; Thirdly, using the computer simulate the collection process and generate the shunting plan. Finally, the C++ program is used to output the shunting operation notice.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信