{"title":"数字化变电站运行中带保留功能的联锁工程","authors":"Guojing Li, B. Duan, Jiaqi Pan, Yunqiang Tan, Yan Liu","doi":"10.1109/ISGT-ASIA.2012.6303324","DOIUrl":null,"url":null,"abstract":"Fast and intelligent operation is a trend with the development of Smart Grid. Switchgear interlocking across bays (substation interlocking), for example, operation at a bus-coupler bay and busbar transfer, has to prevent simultaneous operation. In order to solve this problem, an interlocking architecture with reservation function is introduced. The operation mechanism is proposed and logical nodes for reservation function are defined. The engineering method for IED update from general interlocking to interlocking with reservation function is elaborated. As a scenario, the reconfiguration process of substation engineering is illustrated. The engineering technique and works proposed in this paper are compatible with IEC61850 standards.","PeriodicalId":330758,"journal":{"name":"IEEE PES Innovative Smart Grid Technologies","volume":"48 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-05-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Engineering of interlocking with reservation function in digital substation operation\",\"authors\":\"Guojing Li, B. Duan, Jiaqi Pan, Yunqiang Tan, Yan Liu\",\"doi\":\"10.1109/ISGT-ASIA.2012.6303324\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Fast and intelligent operation is a trend with the development of Smart Grid. Switchgear interlocking across bays (substation interlocking), for example, operation at a bus-coupler bay and busbar transfer, has to prevent simultaneous operation. In order to solve this problem, an interlocking architecture with reservation function is introduced. The operation mechanism is proposed and logical nodes for reservation function are defined. The engineering method for IED update from general interlocking to interlocking with reservation function is elaborated. As a scenario, the reconfiguration process of substation engineering is illustrated. The engineering technique and works proposed in this paper are compatible with IEC61850 standards.\",\"PeriodicalId\":330758,\"journal\":{\"name\":\"IEEE PES Innovative Smart Grid Technologies\",\"volume\":\"48 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2012-05-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IEEE PES Innovative Smart Grid Technologies\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISGT-ASIA.2012.6303324\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE PES Innovative Smart Grid Technologies","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISGT-ASIA.2012.6303324","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

快速智能化运行是智能电网发展的必然趋势。开关柜跨槽联锁(变电站联锁),例如,在母线耦合器槽和母线转移处操作,必须防止同时操作。为了解决这一问题,引入了带保留功能的联锁结构。提出了保留函数的运行机制,定义了保留函数的逻辑节点。阐述了IED由一般联锁升级为带保留函数联锁的工程方法。以场景为例,阐述了变电站工程的重构过程。本文提出的工程技术和工程方法均符合IEC61850标准。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Engineering of interlocking with reservation function in digital substation operation
Fast and intelligent operation is a trend with the development of Smart Grid. Switchgear interlocking across bays (substation interlocking), for example, operation at a bus-coupler bay and busbar transfer, has to prevent simultaneous operation. In order to solve this problem, an interlocking architecture with reservation function is introduced. The operation mechanism is proposed and logical nodes for reservation function are defined. The engineering method for IED update from general interlocking to interlocking with reservation function is elaborated. As a scenario, the reconfiguration process of substation engineering is illustrated. The engineering technique and works proposed in this paper are compatible with IEC61850 standards.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信