{"title":"有关付款的法定规定","authors":"The Rt Hon. Lord Justice Coulson","doi":"10.1093/oso/9780198822110.003.0004","DOIUrl":null,"url":null,"abstract":"At the heart of these provisions is the attempt to ensure that every construction contract contains a transparent and straightforward mechanism for the payment to the contractor of interim payments on account (sometimes called instalments or progress payments). In addition it recognizes that, although there will inevitably be a period between the date on which a payment becomes due, and the final date on which that sum must be paid, it imposes an obligation on the payer to notify the payee well in advance of the final date for payment how much is going to be paid and how that sum has been calculated.","PeriodicalId":434490,"journal":{"name":"Coulson on Construction Adjudication","volume":"119 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-12-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The Statutory Provisions Relating to Payment\",\"authors\":\"The Rt Hon. Lord Justice Coulson\",\"doi\":\"10.1093/oso/9780198822110.003.0004\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"At the heart of these provisions is the attempt to ensure that every construction contract contains a transparent and straightforward mechanism for the payment to the contractor of interim payments on account (sometimes called instalments or progress payments). In addition it recognizes that, although there will inevitably be a period between the date on which a payment becomes due, and the final date on which that sum must be paid, it imposes an obligation on the payer to notify the payee well in advance of the final date for payment how much is going to be paid and how that sum has been calculated.\",\"PeriodicalId\":434490,\"journal\":{\"name\":\"Coulson on Construction Adjudication\",\"volume\":\"119 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-12-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Coulson on Construction Adjudication\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1093/oso/9780198822110.003.0004\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Coulson on Construction Adjudication","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1093/oso/9780198822110.003.0004","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
At the heart of these provisions is the attempt to ensure that every construction contract contains a transparent and straightforward mechanism for the payment to the contractor of interim payments on account (sometimes called instalments or progress payments). In addition it recognizes that, although there will inevitably be a period between the date on which a payment becomes due, and the final date on which that sum must be paid, it imposes an obligation on the payer to notify the payee well in advance of the final date for payment how much is going to be paid and how that sum has been calculated.