在低压设备中观察到的避雷器接地电阻与雷击浪涌行为的关系

Tetsuya Hidaka, K. Ishimoto, A. Asakawa, Katsushi Shiota
{"title":"在低压设备中观察到的避雷器接地电阻与雷击浪涌行为的关系","authors":"Tetsuya Hidaka, K. Ishimoto, A. Asakawa, Katsushi Shiota","doi":"10.1109/SIPDA.2013.6729208","DOIUrl":null,"url":null,"abstract":"We have clarified the relationship between the grounding resistance of surge arresters and the lightning surge behavior observed in low-voltage equipment by Electro-Magnetic Transients Program analysis. The result shows that the grounding resistance of surge arresters installed on a pole with a pole transformer can be increased to some extent without decreasing the lightning protection level of the low-voltage equipment by the installation of an overhead ground wire and the shortening of the interval between concrete poles with surge arresters. A reduction in the cost of grounding construction can be expected.","PeriodicalId":216871,"journal":{"name":"2013 International Symposium on Lightning Protection (XII SIPDA)","volume":"78 4 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Relationship between grounding resistance connected to surge arresters and lightning surge behavior observed in low-voltage equipment\",\"authors\":\"Tetsuya Hidaka, K. Ishimoto, A. Asakawa, Katsushi Shiota\",\"doi\":\"10.1109/SIPDA.2013.6729208\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"We have clarified the relationship between the grounding resistance of surge arresters and the lightning surge behavior observed in low-voltage equipment by Electro-Magnetic Transients Program analysis. The result shows that the grounding resistance of surge arresters installed on a pole with a pole transformer can be increased to some extent without decreasing the lightning protection level of the low-voltage equipment by the installation of an overhead ground wire and the shortening of the interval between concrete poles with surge arresters. A reduction in the cost of grounding construction can be expected.\",\"PeriodicalId\":216871,\"journal\":{\"name\":\"2013 International Symposium on Lightning Protection (XII SIPDA)\",\"volume\":\"78 4 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2013-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2013 International Symposium on Lightning Protection (XII SIPDA)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/SIPDA.2013.6729208\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 International Symposium on Lightning Protection (XII SIPDA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SIPDA.2013.6729208","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

通过电磁瞬变程序分析,阐明了雷电避雷器接地电阻与低压设备雷电瞬变行为之间的关系。结果表明,在不降低低压设备防雷等级的前提下,通过架空接地线的安装和缩短避雷器的混凝土杆间距,可以在一定程度上提高避雷器的接地电阻。接地建设成本的降低是可以预期的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Relationship between grounding resistance connected to surge arresters and lightning surge behavior observed in low-voltage equipment
We have clarified the relationship between the grounding resistance of surge arresters and the lightning surge behavior observed in low-voltage equipment by Electro-Magnetic Transients Program analysis. The result shows that the grounding resistance of surge arresters installed on a pole with a pole transformer can be increased to some extent without decreasing the lightning protection level of the low-voltage equipment by the installation of an overhead ground wire and the shortening of the interval between concrete poles with surge arresters. A reduction in the cost of grounding construction can be expected.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信