生产线动态多技能劳动力规划的混合仿真方法

Yuan Feng, Wenhui Fan
{"title":"生产线动态多技能劳动力规划的混合仿真方法","authors":"Yuan Feng, Wenhui Fan","doi":"10.1109/WSC.2014.7020014","DOIUrl":null,"url":null,"abstract":"Workers cross-trained with multiple tasks can improve the workforce flexibility for the plant to handle variations in workload. Therefore, it is necessary to study the dynamic multi-skilled workforce planning problem of production line with the application of cross-training method. The conclusion is helpful to economize the cost of human resources when workload is low and enhance the productivity in the opposite case. This paper studies the dynamic multi-skilled workforce planning problem by exploring the effect of worker pool size and cross-training level on the performance of production line through simulation. A hybrid simulation model is built as the platform to study this problem with Discrete-event Simulation (DES) method and Agent-based Simulation (ABS) method. Besides, the effect of worker learning and forgetting is inevitably considered accompanied with the introduction of cross-training method and its impact on production line will be illustrated.","PeriodicalId":446873,"journal":{"name":"Proceedings of the Winter Simulation Conference 2014","volume":"58 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-12-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"A hybrid simulation approach to dynamic multi-skilled workforce planning of production line\",\"authors\":\"Yuan Feng, Wenhui Fan\",\"doi\":\"10.1109/WSC.2014.7020014\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Workers cross-trained with multiple tasks can improve the workforce flexibility for the plant to handle variations in workload. Therefore, it is necessary to study the dynamic multi-skilled workforce planning problem of production line with the application of cross-training method. The conclusion is helpful to economize the cost of human resources when workload is low and enhance the productivity in the opposite case. This paper studies the dynamic multi-skilled workforce planning problem by exploring the effect of worker pool size and cross-training level on the performance of production line through simulation. A hybrid simulation model is built as the platform to study this problem with Discrete-event Simulation (DES) method and Agent-based Simulation (ABS) method. Besides, the effect of worker learning and forgetting is inevitably considered accompanied with the introduction of cross-training method and its impact on production line will be illustrated.\",\"PeriodicalId\":446873,\"journal\":{\"name\":\"Proceedings of the Winter Simulation Conference 2014\",\"volume\":\"58 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-12-07\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the Winter Simulation Conference 2014\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/WSC.2014.7020014\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Winter Simulation Conference 2014","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/WSC.2014.7020014","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

对工人进行多任务交叉培训可以提高工厂劳动力的灵活性,以处理工作量的变化。因此,有必要应用交叉培训方法对生产线动态多技能劳动力规划问题进行研究。研究结果有助于在低工作量情况下节约人力资源成本,在低工作量情况下提高生产率。本文通过仿真研究了工人池规模和交叉培训水平对生产线绩效的影响,研究了动态多技能劳动力规划问题。采用离散事件仿真(DES)方法和基于agent的仿真(ABS)方法,建立了混合仿真模型作为研究平台。此外,随着交叉培训方法的引入,不可避免地要考虑到工人的学习和遗忘的影响,并说明其对生产线的影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A hybrid simulation approach to dynamic multi-skilled workforce planning of production line
Workers cross-trained with multiple tasks can improve the workforce flexibility for the plant to handle variations in workload. Therefore, it is necessary to study the dynamic multi-skilled workforce planning problem of production line with the application of cross-training method. The conclusion is helpful to economize the cost of human resources when workload is low and enhance the productivity in the opposite case. This paper studies the dynamic multi-skilled workforce planning problem by exploring the effect of worker pool size and cross-training level on the performance of production line through simulation. A hybrid simulation model is built as the platform to study this problem with Discrete-event Simulation (DES) method and Agent-based Simulation (ABS) method. Besides, the effect of worker learning and forgetting is inevitably considered accompanied with the introduction of cross-training method and its impact on production line will be illustrated.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信