{"title":"基于摄动观察法的非隔离升压变换器热电发电机最大功率点跟踪负载行为仿真","authors":"Hayati Mamur, Çiğdem Akyildiz, Mehmet Ali Üstüner","doi":"10.30516/bilgesci.1201697","DOIUrl":null,"url":null,"abstract":"The efficiency of thermoelectric generators (TEGs) is quite low. To operate the TEGs at the maximum power point (MPP), the internal resistance of the connected load and the TEG must be equal. This is not always possible. For this, converters containing the maximum power point tracking (MPPT) algorithm tracking MPP are placed between the TEG and the load. These converters cannot perform MPPT on every connected load value. The aim of this study is to investigate at which load values MPPT can be performed in non-isolated boost converters by using perturb & observation (P&O) method. For this purpose, a 50 W converter was designed with a 45.76 W TEG in MATLAB/Simulink environment. Load resistance value has been increased starting from the minimum value up to 5.84 ohm being the internal resistance value of the TEG. For this case, the amount of error in MPPT was large up to the internal resistance value of the TEG. In other words, the P&O algorithm could not perform MPPT. When the load resistance value started from 5.84 ohms and increased to larger values, MPPT could be performed by means of the non-isolated boost converter with the P&O algorithm.","PeriodicalId":133012,"journal":{"name":"Bilge International Journal of Science and Technology Research","volume":"612 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-02-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Simulation of Load Behavior Based on Perturb-Observation Method in Non-Isolated Boost Converter for Maximum Power Point Tracking of Thermoelectric Generators\",\"authors\":\"Hayati Mamur, Çiğdem Akyildiz, Mehmet Ali Üstüner\",\"doi\":\"10.30516/bilgesci.1201697\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The efficiency of thermoelectric generators (TEGs) is quite low. To operate the TEGs at the maximum power point (MPP), the internal resistance of the connected load and the TEG must be equal. This is not always possible. For this, converters containing the maximum power point tracking (MPPT) algorithm tracking MPP are placed between the TEG and the load. These converters cannot perform MPPT on every connected load value. The aim of this study is to investigate at which load values MPPT can be performed in non-isolated boost converters by using perturb & observation (P&O) method. For this purpose, a 50 W converter was designed with a 45.76 W TEG in MATLAB/Simulink environment. Load resistance value has been increased starting from the minimum value up to 5.84 ohm being the internal resistance value of the TEG. For this case, the amount of error in MPPT was large up to the internal resistance value of the TEG. In other words, the P&O algorithm could not perform MPPT. When the load resistance value started from 5.84 ohms and increased to larger values, MPPT could be performed by means of the non-isolated boost converter with the P&O algorithm.\",\"PeriodicalId\":133012,\"journal\":{\"name\":\"Bilge International Journal of Science and Technology Research\",\"volume\":\"612 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-02-13\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Bilge International Journal of Science and Technology Research\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.30516/bilgesci.1201697\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Bilge International Journal of Science and Technology Research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30516/bilgesci.1201697","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
摘要
热电发电机(teg)的效率很低。为了使TEG工作在MPP (maximum power point),所连接负载的内阻和TEG必须相等。这并不总是可能的。为此,包含最大功率点跟踪(MPPT)算法的转换器被放置在TEG和负载之间。这些转换器不能对每个连接的负载值执行MPPT。本研究的目的是通过摄动和观察(P&O)方法来研究在非隔离升压变换器中,在哪些负载值下可以执行MPPT。为此,在MATLAB/Simulink环境下,以45.76 W的TEG设计了一个50 W的变换器。负载电阻值从最小值增加到5.84欧姆,即TEG的内阻值。在这种情况下,MPPT的误差量很大,直到TEG的内阻值。也就是说,P&O算法不能执行MPPT。当负载电阻值从5.84欧姆开始逐渐增大时,可以通过采用P&O算法的非隔离升压变换器实现MPPT。
Simulation of Load Behavior Based on Perturb-Observation Method in Non-Isolated Boost Converter for Maximum Power Point Tracking of Thermoelectric Generators
The efficiency of thermoelectric generators (TEGs) is quite low. To operate the TEGs at the maximum power point (MPP), the internal resistance of the connected load and the TEG must be equal. This is not always possible. For this, converters containing the maximum power point tracking (MPPT) algorithm tracking MPP are placed between the TEG and the load. These converters cannot perform MPPT on every connected load value. The aim of this study is to investigate at which load values MPPT can be performed in non-isolated boost converters by using perturb & observation (P&O) method. For this purpose, a 50 W converter was designed with a 45.76 W TEG in MATLAB/Simulink environment. Load resistance value has been increased starting from the minimum value up to 5.84 ohm being the internal resistance value of the TEG. For this case, the amount of error in MPPT was large up to the internal resistance value of the TEG. In other words, the P&O algorithm could not perform MPPT. When the load resistance value started from 5.84 ohms and increased to larger values, MPPT could be performed by means of the non-isolated boost converter with the P&O algorithm.