{"title":"基于“销售-配送-调度”综合抢修网络的配电网主动抢修优化方法","authors":"Shihua Zhao, Zong Guo, Fengyu Wu, Bin Fu, Jiarui Li, Hongbo Lian, Yi Hu, Renjie Dai, Yang Chen","doi":"10.1109/CICED50259.2021.9556753","DOIUrl":null,"url":null,"abstract":"at present, the rush-repair schedule of distribution network becomes an important factor which affects the reliability of power grid.The four problems that affect the process of rush-repair are as follows: 1) Failure to receive complete failure information; 2) Fault diagnosis depending on personal experience; 3) The process of dispatching is cumbersome; 4) Lack of experience summary after rush-repair. The above factors affect the fault judgment of dispatchers, slowing down the command response speed and prolonging the rush-repair progress and outage time of power failure.To solve the above problems, this research is put forward. An active rush-repair strategy based on association relation method is proposed. An intelligent fault diagnosis based on BP algorithm is proposed. To optimize the process of dispatching command, \"Marketing-Distribution-Dispatch-Repair\" rush-repair database is proposed. The case analysis shows that the research plays a positive role in the rapid judgment of fault causes, the acceleration of rush-repair command speed and the shortening of fault outage time. This research will help to improve the power supply reliability of power grid.","PeriodicalId":221387,"journal":{"name":"2021 China International Conference on Electricity Distribution (CICED)","volume":"7 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-04-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Optimization Method of Active Rush-Repair for Distribution Network Based on the “Marketing-Distribution-Dispatch” Integrated Rush-repair Network\",\"authors\":\"Shihua Zhao, Zong Guo, Fengyu Wu, Bin Fu, Jiarui Li, Hongbo Lian, Yi Hu, Renjie Dai, Yang Chen\",\"doi\":\"10.1109/CICED50259.2021.9556753\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"at present, the rush-repair schedule of distribution network becomes an important factor which affects the reliability of power grid.The four problems that affect the process of rush-repair are as follows: 1) Failure to receive complete failure information; 2) Fault diagnosis depending on personal experience; 3) The process of dispatching is cumbersome; 4) Lack of experience summary after rush-repair. The above factors affect the fault judgment of dispatchers, slowing down the command response speed and prolonging the rush-repair progress and outage time of power failure.To solve the above problems, this research is put forward. An active rush-repair strategy based on association relation method is proposed. An intelligent fault diagnosis based on BP algorithm is proposed. To optimize the process of dispatching command, \\\"Marketing-Distribution-Dispatch-Repair\\\" rush-repair database is proposed. The case analysis shows that the research plays a positive role in the rapid judgment of fault causes, the acceleration of rush-repair command speed and the shortening of fault outage time. This research will help to improve the power supply reliability of power grid.\",\"PeriodicalId\":221387,\"journal\":{\"name\":\"2021 China International Conference on Electricity Distribution (CICED)\",\"volume\":\"7 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-04-07\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2021 China International Conference on Electricity Distribution (CICED)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CICED50259.2021.9556753\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 China International Conference on Electricity Distribution (CICED)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CICED50259.2021.9556753","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Optimization Method of Active Rush-Repair for Distribution Network Based on the “Marketing-Distribution-Dispatch” Integrated Rush-repair Network
at present, the rush-repair schedule of distribution network becomes an important factor which affects the reliability of power grid.The four problems that affect the process of rush-repair are as follows: 1) Failure to receive complete failure information; 2) Fault diagnosis depending on personal experience; 3) The process of dispatching is cumbersome; 4) Lack of experience summary after rush-repair. The above factors affect the fault judgment of dispatchers, slowing down the command response speed and prolonging the rush-repair progress and outage time of power failure.To solve the above problems, this research is put forward. An active rush-repair strategy based on association relation method is proposed. An intelligent fault diagnosis based on BP algorithm is proposed. To optimize the process of dispatching command, "Marketing-Distribution-Dispatch-Repair" rush-repair database is proposed. The case analysis shows that the research plays a positive role in the rapid judgment of fault causes, the acceleration of rush-repair command speed and the shortening of fault outage time. This research will help to improve the power supply reliability of power grid.