用调度方法改进宽带PLC接入网的带宽分配

A. Haidine, R. Lehnert
{"title":"用调度方法改进宽带PLC接入网的带宽分配","authors":"A. Haidine, R. Lehnert","doi":"10.1109/ISPLC.2009.4913413","DOIUrl":null,"url":null,"abstract":"This work deals with the planning of the broadband power line communications networks. The design process of these networks is subdivided into two main sub-problems; namely the Generalized Base Station Placement problem and the Channel Allocation Problem (CAP). This CAP is the focus of this work. It is modelled as a Multi-objective Optimization problem and solved by multi-objective optimization algorithms. Based on our previous investigations in this field, we propose in this paper the application of a dispatching method, in order to allocate better and fairly the available set of channels to PLC cells. The advantage of this dispatching is reflected by the improved algorithms convergence. The algorithms performance is evaluated using some network reference scenarios.","PeriodicalId":321296,"journal":{"name":"2009 IEEE International Symposium on Power Line Communications and Its Applications","volume":"262 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Improvement of bandwidth assignment in broadband PLC access networks by means of dispatching method\",\"authors\":\"A. Haidine, R. Lehnert\",\"doi\":\"10.1109/ISPLC.2009.4913413\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This work deals with the planning of the broadband power line communications networks. The design process of these networks is subdivided into two main sub-problems; namely the Generalized Base Station Placement problem and the Channel Allocation Problem (CAP). This CAP is the focus of this work. It is modelled as a Multi-objective Optimization problem and solved by multi-objective optimization algorithms. Based on our previous investigations in this field, we propose in this paper the application of a dispatching method, in order to allocate better and fairly the available set of channels to PLC cells. The advantage of this dispatching is reflected by the improved algorithms convergence. The algorithms performance is evaluated using some network reference scenarios.\",\"PeriodicalId\":321296,\"journal\":{\"name\":\"2009 IEEE International Symposium on Power Line Communications and Its Applications\",\"volume\":\"262 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-03-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2009 IEEE International Symposium on Power Line Communications and Its Applications\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISPLC.2009.4913413\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 IEEE International Symposium on Power Line Communications and Its Applications","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISPLC.2009.4913413","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

本文主要研究宽带电力线通信网络的规划问题。这些网络的设计过程分为两个主要的子问题;即广义基站放置问题和信道分配问题。该CAP是这项工作的重点。将其建模为一个多目标优化问题,并采用多目标优化算法求解。在前人研究的基础上,本文提出了一种调度方法的应用,以便更好、公平地将可用的信道集分配给PLC单元。这种调度的优势体现在改进算法的收敛性上。通过一些网络参考场景对算法的性能进行了评估。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Improvement of bandwidth assignment in broadband PLC access networks by means of dispatching method
This work deals with the planning of the broadband power line communications networks. The design process of these networks is subdivided into two main sub-problems; namely the Generalized Base Station Placement problem and the Channel Allocation Problem (CAP). This CAP is the focus of this work. It is modelled as a Multi-objective Optimization problem and solved by multi-objective optimization algorithms. Based on our previous investigations in this field, we propose in this paper the application of a dispatching method, in order to allocate better and fairly the available set of channels to PLC cells. The advantage of this dispatching is reflected by the improved algorithms convergence. The algorithms performance is evaluated using some network reference scenarios.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信