{"title":"具有维修活动、顺序依赖和装配时间的作业车间调度问题中规则准则最小化的快速Pareto方法","authors":"A. García-León, W. Tapia","doi":"10.1007/978-3-030-61834-6_16","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":201362,"journal":{"name":"Workshop on Engineering Applications","volume":"3 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-10-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A Fast Pareto Approach to Minimize Regular Criteria in the Job-shop Scheduling Problem with Maintenance Activities, Sequence Dependent and Set-up Times\",\"authors\":\"A. García-León, W. Tapia\",\"doi\":\"10.1007/978-3-030-61834-6_16\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":201362,\"journal\":{\"name\":\"Workshop on Engineering Applications\",\"volume\":\"3 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-10-08\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Workshop on Engineering Applications\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1007/978-3-030-61834-6_16\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Workshop on Engineering Applications","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1007/978-3-030-61834-6_16","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
A Fast Pareto Approach to Minimize Regular Criteria in the Job-shop Scheduling Problem with Maintenance Activities, Sequence Dependent and Set-up Times