{"title":"确定影响不同应用程序和任务类型的工作量估计准确性的因素","authors":"Saqib Bukhari, Ali Afzal Malik","doi":"10.1109/FIT.2012.16","DOIUrl":null,"url":null,"abstract":"An important asset in the skill set of any software project manager is the ability to somewhat accurately estimate the effort required to develop a software application. Acquiring this asset, however, requires a thorough understanding of the factors that may affect the accuracy of these estimates. This paper presents the results of an empirical study conducted to determine the causes of variation in the accuracy of effort estimations for different application and task types. A Pakistani software house that specializes in developing financial transaction processing applications is chosen for this empirical study. Actual and estimated values for software development effort are gathered and analyzed for four different types of applications - web-based, database, parallel processing, and telephony - each having six different types of tasks i.e. business-development, new features, usability, security, support, and performance. Over 1000 data points are considered. Analysis of the results reveals, for instance, that the effort for web-based applications is mostly underestimated while the effort for telephony applications is mostly overestimated. The underestimation in web-based applications is usually due to a failure to account for the learning curve associated with rapidly changing web technologies while the overestimation in telephony applications is usually due to a failure to account for the usage of third-party components.","PeriodicalId":166149,"journal":{"name":"2012 10th International Conference on Frontiers of Information Technology","volume":"16 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-12-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Determining the Factors Affecting the Accuracy of Effort Estimates for Different Application and Task Types\",\"authors\":\"Saqib Bukhari, Ali Afzal Malik\",\"doi\":\"10.1109/FIT.2012.16\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"An important asset in the skill set of any software project manager is the ability to somewhat accurately estimate the effort required to develop a software application. Acquiring this asset, however, requires a thorough understanding of the factors that may affect the accuracy of these estimates. This paper presents the results of an empirical study conducted to determine the causes of variation in the accuracy of effort estimations for different application and task types. A Pakistani software house that specializes in developing financial transaction processing applications is chosen for this empirical study. Actual and estimated values for software development effort are gathered and analyzed for four different types of applications - web-based, database, parallel processing, and telephony - each having six different types of tasks i.e. business-development, new features, usability, security, support, and performance. Over 1000 data points are considered. Analysis of the results reveals, for instance, that the effort for web-based applications is mostly underestimated while the effort for telephony applications is mostly overestimated. The underestimation in web-based applications is usually due to a failure to account for the learning curve associated with rapidly changing web technologies while the overestimation in telephony applications is usually due to a failure to account for the usage of third-party components.\",\"PeriodicalId\":166149,\"journal\":{\"name\":\"2012 10th International Conference on Frontiers of Information Technology\",\"volume\":\"16 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2012-12-17\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2012 10th International Conference on Frontiers of Information Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/FIT.2012.16\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 10th International Conference on Frontiers of Information Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/FIT.2012.16","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

在任何软件项目经理的技能集中,一项重要的资产是能够多少准确地估计开发软件应用程序所需的工作量。然而,获取该资产需要对可能影响这些估计准确性的因素有透彻的了解。本文提出了一项实证研究的结果,以确定不同应用程序和任务类型的工作量估计准确性变化的原因。本实证研究选择了一家专门开发金融交易处理应用程序的巴基斯坦软件公司。软件开发工作的实际价值和估计价值被收集并分析为四种不同类型的应用程序——基于web的、数据库的、并行处理的和电话的——每一种都有六种不同类型的任务,即业务开发、新特性、可用性、安全性、支持和性能。考虑超过1000个数据点。例如,对结果的分析表明,网络应用程序的努力大多被低估了,而电话应用程序的努力大多被高估了。基于web的应用程序的低估通常是由于没有考虑到与快速变化的web技术相关的学习曲线,而电话应用程序的高估通常是由于没有考虑到第三方组件的使用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Determining the Factors Affecting the Accuracy of Effort Estimates for Different Application and Task Types
An important asset in the skill set of any software project manager is the ability to somewhat accurately estimate the effort required to develop a software application. Acquiring this asset, however, requires a thorough understanding of the factors that may affect the accuracy of these estimates. This paper presents the results of an empirical study conducted to determine the causes of variation in the accuracy of effort estimations for different application and task types. A Pakistani software house that specializes in developing financial transaction processing applications is chosen for this empirical study. Actual and estimated values for software development effort are gathered and analyzed for four different types of applications - web-based, database, parallel processing, and telephony - each having six different types of tasks i.e. business-development, new features, usability, security, support, and performance. Over 1000 data points are considered. Analysis of the results reveals, for instance, that the effort for web-based applications is mostly underestimated while the effort for telephony applications is mostly overestimated. The underestimation in web-based applications is usually due to a failure to account for the learning curve associated with rapidly changing web technologies while the overestimation in telephony applications is usually due to a failure to account for the usage of third-party components.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信