Richard G. Kiah, Brian A. Smith, Nicholas W. Stasulis
{"title":"2019年4月洪水在新英格兰选定的美国地质调查局河道的初步阶段和流量数据","authors":"Richard G. Kiah, Brian A. Smith, Nicholas W. Stasulis","doi":"10.3133/OFR20191052","DOIUrl":null,"url":null,"abstract":"U.S. Geological Survey Streamgages in New England for the Floods of April 2019 T combination of rainfall and snowmelt in northern New England and rainfall in southern New England resulted in minor to major flooding from April 15 to 24, 2019, according to stage and streamflow data collected at 63 selected U.S. Geological Survey (USGS) streamgages. A typical USGS streamgage measures and records stream stage and estimates streamflow based on a relation (rating curve) of discrete measurements of streamflow and the recorded stage. USGS hydrographers were deployed during and after these storms to measure the streamflow of the flooded rivers and confirm streamgage rating curves.","PeriodicalId":142152,"journal":{"name":"Open-File Report","volume":"5 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Preliminary stage and streamflow data at selected U.S. Geological Survey streamgages in New England for the floods of April 2019\",\"authors\":\"Richard G. Kiah, Brian A. Smith, Nicholas W. Stasulis\",\"doi\":\"10.3133/OFR20191052\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"U.S. Geological Survey Streamgages in New England for the Floods of April 2019 T combination of rainfall and snowmelt in northern New England and rainfall in southern New England resulted in minor to major flooding from April 15 to 24, 2019, according to stage and streamflow data collected at 63 selected U.S. Geological Survey (USGS) streamgages. A typical USGS streamgage measures and records stream stage and estimates streamflow based on a relation (rating curve) of discrete measurements of streamflow and the recorded stage. USGS hydrographers were deployed during and after these storms to measure the streamflow of the flooded rivers and confirm streamgage rating curves.\",\"PeriodicalId\":142152,\"journal\":{\"name\":\"Open-File Report\",\"volume\":\"5 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Open-File Report\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.3133/OFR20191052\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Open-File Report","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3133/OFR20191052","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Preliminary stage and streamflow data at selected U.S. Geological Survey streamgages in New England for the floods of April 2019
U.S. Geological Survey Streamgages in New England for the Floods of April 2019 T combination of rainfall and snowmelt in northern New England and rainfall in southern New England resulted in minor to major flooding from April 15 to 24, 2019, according to stage and streamflow data collected at 63 selected U.S. Geological Survey (USGS) streamgages. A typical USGS streamgage measures and records stream stage and estimates streamflow based on a relation (rating curve) of discrete measurements of streamflow and the recorded stage. USGS hydrographers were deployed during and after these storms to measure the streamflow of the flooded rivers and confirm streamgage rating curves.