{"title":"安装电容器组改善亚齐分系统150kv输电线路电压分布","authors":"A. Hasibuan, M. Isa, I. Nrartha, S. Hardi","doi":"10.1109/elticom47379.2019.8943910","DOIUrl":null,"url":null,"abstract":"Long transmission line has many problems, one of which is the voltage drop at the load center. The Banda Aceh subsystem is a sub-system with a load center connected via a 150 kV transmission line with a North Sumatra subsystem. This transmission line has a length of nearly 700 km. Very low voltage in the subsystem Banda Aceh occurred in the operating system when only one generating unit on the plant Nagan Raya. The increase in voltage drop is done by installing a capacitor bank in the Banda Aceh subsystem. The results of installing capacitor banks can increase system voltage in the range of 7–8 kV, enlarge the power transfer from the North Sumatra subsystem and reduce the risk of black out due to low voltage on the system.","PeriodicalId":131994,"journal":{"name":"2019 3rd International Conference on Electrical, Telecommunication and Computer Engineering (ELTICOM)","volume":"49 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Improving Voltage Profile of 150 KV Transmission Line in Aceh Subsystem with Capacitor Bank Installation\",\"authors\":\"A. Hasibuan, M. Isa, I. Nrartha, S. Hardi\",\"doi\":\"10.1109/elticom47379.2019.8943910\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Long transmission line has many problems, one of which is the voltage drop at the load center. The Banda Aceh subsystem is a sub-system with a load center connected via a 150 kV transmission line with a North Sumatra subsystem. This transmission line has a length of nearly 700 km. Very low voltage in the subsystem Banda Aceh occurred in the operating system when only one generating unit on the plant Nagan Raya. The increase in voltage drop is done by installing a capacitor bank in the Banda Aceh subsystem. The results of installing capacitor banks can increase system voltage in the range of 7–8 kV, enlarge the power transfer from the North Sumatra subsystem and reduce the risk of black out due to low voltage on the system.\",\"PeriodicalId\":131994,\"journal\":{\"name\":\"2019 3rd International Conference on Electrical, Telecommunication and Computer Engineering (ELTICOM)\",\"volume\":\"49 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2019 3rd International Conference on Electrical, Telecommunication and Computer Engineering (ELTICOM)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/elticom47379.2019.8943910\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 3rd International Conference on Electrical, Telecommunication and Computer Engineering (ELTICOM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/elticom47379.2019.8943910","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Improving Voltage Profile of 150 KV Transmission Line in Aceh Subsystem with Capacitor Bank Installation
Long transmission line has many problems, one of which is the voltage drop at the load center. The Banda Aceh subsystem is a sub-system with a load center connected via a 150 kV transmission line with a North Sumatra subsystem. This transmission line has a length of nearly 700 km. Very low voltage in the subsystem Banda Aceh occurred in the operating system when only one generating unit on the plant Nagan Raya. The increase in voltage drop is done by installing a capacitor bank in the Banda Aceh subsystem. The results of installing capacitor banks can increase system voltage in the range of 7–8 kV, enlarge the power transfer from the North Sumatra subsystem and reduce the risk of black out due to low voltage on the system.