安装电容器组改善亚齐分系统150kv输电线路电压分布

A. Hasibuan, M. Isa, I. Nrartha, S. Hardi
{"title":"安装电容器组改善亚齐分系统150kv输电线路电压分布","authors":"A. Hasibuan, M. Isa, I. Nrartha, S. Hardi","doi":"10.1109/elticom47379.2019.8943910","DOIUrl":null,"url":null,"abstract":"Long transmission line has many problems, one of which is the voltage drop at the load center. The Banda Aceh subsystem is a sub-system with a load center connected via a 150 kV transmission line with a North Sumatra subsystem. This transmission line has a length of nearly 700 km. Very low voltage in the subsystem Banda Aceh occurred in the operating system when only one generating unit on the plant Nagan Raya. The increase in voltage drop is done by installing a capacitor bank in the Banda Aceh subsystem. The results of installing capacitor banks can increase system voltage in the range of 7–8 kV, enlarge the power transfer from the North Sumatra subsystem and reduce the risk of black out due to low voltage on the system.","PeriodicalId":131994,"journal":{"name":"2019 3rd International Conference on Electrical, Telecommunication and Computer Engineering (ELTICOM)","volume":"49 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Improving Voltage Profile of 150 KV Transmission Line in Aceh Subsystem with Capacitor Bank Installation\",\"authors\":\"A. Hasibuan, M. Isa, I. Nrartha, S. Hardi\",\"doi\":\"10.1109/elticom47379.2019.8943910\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Long transmission line has many problems, one of which is the voltage drop at the load center. The Banda Aceh subsystem is a sub-system with a load center connected via a 150 kV transmission line with a North Sumatra subsystem. This transmission line has a length of nearly 700 km. Very low voltage in the subsystem Banda Aceh occurred in the operating system when only one generating unit on the plant Nagan Raya. The increase in voltage drop is done by installing a capacitor bank in the Banda Aceh subsystem. The results of installing capacitor banks can increase system voltage in the range of 7–8 kV, enlarge the power transfer from the North Sumatra subsystem and reduce the risk of black out due to low voltage on the system.\",\"PeriodicalId\":131994,\"journal\":{\"name\":\"2019 3rd International Conference on Electrical, Telecommunication and Computer Engineering (ELTICOM)\",\"volume\":\"49 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2019 3rd International Conference on Electrical, Telecommunication and Computer Engineering (ELTICOM)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/elticom47379.2019.8943910\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 3rd International Conference on Electrical, Telecommunication and Computer Engineering (ELTICOM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/elticom47379.2019.8943910","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

长输电线路存在许多问题,其中之一就是负荷中心的电压降。班达亚齐子系统是一个子系统,其负载中心通过一条150千伏的输电线路与北苏门答腊子系统相连。这条输电线长近700公里。极低电压在班达亚齐子系统发生时,操作系统上只有一个发电机组在纳甘拉亚电站。电压降的增加是通过在班达亚齐子系统中安装电容器组来实现的。安装电容器组可使系统电压在7 ~ 8 kV范围内提高,增大北苏门答腊分系统的电力输送,降低系统因低压而停电的风险。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Improving Voltage Profile of 150 KV Transmission Line in Aceh Subsystem with Capacitor Bank Installation
Long transmission line has many problems, one of which is the voltage drop at the load center. The Banda Aceh subsystem is a sub-system with a load center connected via a 150 kV transmission line with a North Sumatra subsystem. This transmission line has a length of nearly 700 km. Very low voltage in the subsystem Banda Aceh occurred in the operating system when only one generating unit on the plant Nagan Raya. The increase in voltage drop is done by installing a capacitor bank in the Banda Aceh subsystem. The results of installing capacitor banks can increase system voltage in the range of 7–8 kV, enlarge the power transfer from the North Sumatra subsystem and reduce the risk of black out due to low voltage on the system.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信