{"title":"遗留过程控制系统迁移","authors":"Kevin A. McFeaters, Dick Ciammaichella, J. Waters","doi":"10.1109/PPIC.2015.7165869","DOIUrl":null,"url":null,"abstract":"Given today's slow economic growth, reduced plant engineering and maintenance staffing and tight capital budget constraints, understanding how best to propose, plan, execute and allocate limited resources for successful process control system migrations is imperative for manufacturers seeking to maintain or increase productivity and efficiencies. Unfortunately, there is little published data on best practices for taking on technical projects of this magnitude let alone establishing a standards based approach for initiating and executing these types of projects.","PeriodicalId":118880,"journal":{"name":"2015 61st IEEE Pulp and Paper Industry Conference (PPIC)","volume":"186 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-06-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Legacy process control system migrations\",\"authors\":\"Kevin A. McFeaters, Dick Ciammaichella, J. Waters\",\"doi\":\"10.1109/PPIC.2015.7165869\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Given today's slow economic growth, reduced plant engineering and maintenance staffing and tight capital budget constraints, understanding how best to propose, plan, execute and allocate limited resources for successful process control system migrations is imperative for manufacturers seeking to maintain or increase productivity and efficiencies. Unfortunately, there is little published data on best practices for taking on technical projects of this magnitude let alone establishing a standards based approach for initiating and executing these types of projects.\",\"PeriodicalId\":118880,\"journal\":{\"name\":\"2015 61st IEEE Pulp and Paper Industry Conference (PPIC)\",\"volume\":\"186 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-06-14\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2015 61st IEEE Pulp and Paper Industry Conference (PPIC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PPIC.2015.7165869\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 61st IEEE Pulp and Paper Industry Conference (PPIC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PPIC.2015.7165869","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Given today's slow economic growth, reduced plant engineering and maintenance staffing and tight capital budget constraints, understanding how best to propose, plan, execute and allocate limited resources for successful process control system migrations is imperative for manufacturers seeking to maintain or increase productivity and efficiencies. Unfortunately, there is little published data on best practices for taking on technical projects of this magnitude let alone establishing a standards based approach for initiating and executing these types of projects.