{"title":"储存管理,以防止在你的郊区郊区发生的自燃事件","authors":"Fajar Khoerul Alam, Solihin, Yunus Ashari","doi":"10.29313/bcsme.v3i2.9218","DOIUrl":null,"url":null,"abstract":"Abstract. PLTU Banten 2 Labuan OMU is a power plant company with the main fuel source being coal with calories 4000-4900 Kcal/kg with a land area of ​​64.45 Ha. This PLTU has a capacity of 2x300 MW of electricity. Self-combustion occurs due to the reaction of the carbon content in coal with oxygen gas in the air. The problem that arises in the Banten 2 Labuan OMU PLTU stockpile is the frequent occurrence of self-burning due to the ineffective implementation of the FIFO (Frist In Frist Out) management system. The sampling technique for stockpile temperature data was carried out at 12 stockpile 1 points of LRC and 12 points of stockpile 2 MRC, observing three sides of the coal pile, namely the west, south and east sides. Where each side of the sample measurement is taken at a thickness of 1, 3, 5, and 7 meters and the 0 meter point is taken from the ground floor of the stockpile. To see the comparison of temperature to embankment time and embankment dimensions at each measurement point with a certain thickness. From all the research conducted, the stockpile had 2 stockpiles of coal, stockpile 1 LRC (Low Rank Calorie) with quality <4200 and stockpile 2 MRC (Medium Rank Calorie) with quality >4200. The height of the stockpile reaches 10.9 meters for stock 1 and 9.6 meters for stock 2, the slope angle of the stockpile is 55.6° for stock 1 and 52.5°. Stockpile 1 has a temperature rise of 3.4°C/day and stockpile 2 has a temperature rise of 3.2. The estimated self-combustion for stockpile 1 is 4 days, while for stockpile 2 it is 5 days, meaning that the coal quality affects self-combustion where stockpile 2 takes 1 day longer than stockpile 1 \nAbstrak. PLTU Banten 2 Labuan OMU merupakan suatu perusahaan pembangkit listrik dengan sumber  bahan bakar utama batubara dengan kalori 4000-4900 Kcal/kg memiliki luas lahan 64,45 Ha. PLTU ini memiliki kapasitas listrik yang dihasilkan 2x300 MW Self-Combustion terjadi karena adanya reaksi kandungan karbon pada batubara dengan gas oksigen di udara. Permasalahan yang muncul pada stockpile PLTU Banten 2 Labuan OMU ini, sering terjadinya swabakar yang disebabkan karena kurang efektifnya penerapan sistem manajemen FIFO (Frist In Frist Out). Teknis pengambilan sempel data suhu timbunan ini dilakukan sebanyak 12 titik stockpile 1 LRC dan 12 titik stockpile 2 MRC, pengamatan pada tiga sisi timbunan batubara yaitu sisi barat, selatan dan timur. Di mana setiap sisi pengukuran sampel diambil pada ketebalan 1, 3, 5, dan 7 meter dan titik 0 meter pengukuran dilakukan dari lantai dasar stockpile. Untuk melihat perbandingan suhu terhadap lama timbunan dan dimensi timbunan pada setiap titik pengukuran dengan ketebalan tertentu. Dari seluruh penelitian yang dilakukan kondisi stockpile memiliki 2 timbunan batubara, stockpile 1 LRC (Low Rank Calorie) dengan kualitas <4200 dan stockpile 2 MRC (Medium Rank Calorie) dengan kualitas >4200. Ketinggian timbunan mencapai 10,9 meter untuk stock 1 dan 9,6 meter untuk stock 2, sudut kemiringan timbunan 55,6° untuk Stock 1 dan 52,5°. Untuk stockpile 1 memiliki kenaikan suhu yaitu 3,4°C/Hari dan untuk stockpile 2 memiliki kenaikan suhu yaitu 3,2. Estimasi swabakar untuk stockpile 1 adalah 4 hari, sedangkan untuk Stockpile 2 adalah 5 hari, artinya kualitas batubara mempengaruhi Self-Combustion yang mana Stockpile 2 lebih lama 1 hari dari Stockpile 1","PeriodicalId":187584,"journal":{"name":"Bandung Conference Series: Mining Engineering","volume":"96 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-07-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Manajemen Stockpile untuk Mencegah Terjadinya Self-Combustion di PLTU Banten 2 Labuan OMU\",\"authors\":\"Fajar Khoerul Alam, Solihin, Yunus Ashari\",\"doi\":\"10.29313/bcsme.v3i2.9218\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract. PLTU Banten 2 Labuan OMU is a power plant company with the main fuel source being coal with calories 4000-4900 Kcal/kg with a land area of ​​64.45 Ha. This PLTU has a capacity of 2x300 MW of electricity. Self-combustion occurs due to the reaction of the carbon content in coal with oxygen gas in the air. The problem that arises in the Banten 2 Labuan OMU PLTU stockpile is the frequent occurrence of self-burning due to the ineffective implementation of the FIFO (Frist In Frist Out) management system. The sampling technique for stockpile temperature data was carried out at 12 stockpile 1 points of LRC and 12 points of stockpile 2 MRC, observing three sides of the coal pile, namely the west, south and east sides. Where each side of the sample measurement is taken at a thickness of 1, 3, 5, and 7 meters and the 0 meter point is taken from the ground floor of the stockpile. To see the comparison of temperature to embankment time and embankment dimensions at each measurement point with a certain thickness. From all the research conducted, the stockpile had 2 stockpiles of coal, stockpile 1 LRC (Low Rank Calorie) with quality <4200 and stockpile 2 MRC (Medium Rank Calorie) with quality >4200. The height of the stockpile reaches 10.9 meters for stock 1 and 9.6 meters for stock 2, the slope angle of the stockpile is 55.6° for stock 1 and 52.5°. Stockpile 1 has a temperature rise of 3.4°C/day and stockpile 2 has a temperature rise of 3.2. The estimated self-combustion for stockpile 1 is 4 days, while for stockpile 2 it is 5 days, meaning that the coal quality affects self-combustion where stockpile 2 takes 1 day longer than stockpile 1 \\nAbstrak. PLTU Banten 2 Labuan OMU merupakan suatu perusahaan pembangkit listrik dengan sumber  bahan bakar utama batubara dengan kalori 4000-4900 Kcal/kg memiliki luas lahan 64,45 Ha. PLTU ini memiliki kapasitas listrik yang dihasilkan 2x300 MW Self-Combustion terjadi karena adanya reaksi kandungan karbon pada batubara dengan gas oksigen di udara. Permasalahan yang muncul pada stockpile PLTU Banten 2 Labuan OMU ini, sering terjadinya swabakar yang disebabkan karena kurang efektifnya penerapan sistem manajemen FIFO (Frist In Frist Out). Teknis pengambilan sempel data suhu timbunan ini dilakukan sebanyak 12 titik stockpile 1 LRC dan 12 titik stockpile 2 MRC, pengamatan pada tiga sisi timbunan batubara yaitu sisi barat, selatan dan timur. Di mana setiap sisi pengukuran sampel diambil pada ketebalan 1, 3, 5, dan 7 meter dan titik 0 meter pengukuran dilakukan dari lantai dasar stockpile. Untuk melihat perbandingan suhu terhadap lama timbunan dan dimensi timbunan pada setiap titik pengukuran dengan ketebalan tertentu. Dari seluruh penelitian yang dilakukan kondisi stockpile memiliki 2 timbunan batubara, stockpile 1 LRC (Low Rank Calorie) dengan kualitas <4200 dan stockpile 2 MRC (Medium Rank Calorie) dengan kualitas >4200. Ketinggian timbunan mencapai 10,9 meter untuk stock 1 dan 9,6 meter untuk stock 2, sudut kemiringan timbunan 55,6° untuk Stock 1 dan 52,5°. Untuk stockpile 1 memiliki kenaikan suhu yaitu 3,4°C/Hari dan untuk stockpile 2 memiliki kenaikan suhu yaitu 3,2. Estimasi swabakar untuk stockpile 1 adalah 4 hari, sedangkan untuk Stockpile 2 adalah 5 hari, artinya kualitas batubara mempengaruhi Self-Combustion yang mana Stockpile 2 lebih lama 1 hari dari Stockpile 1\",\"PeriodicalId\":187584,\"journal\":{\"name\":\"Bandung Conference Series: Mining Engineering\",\"volume\":\"96 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-07-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Bandung Conference Series: Mining Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.29313/bcsme.v3i2.9218\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Bandung Conference Series: Mining Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29313/bcsme.v3i2.9218","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

摘要PLTU万丹2纳闽OMU是一家以煤为主要燃料来源的电厂公司,热量为4000-4900千卡/公斤,占地面积为64.45公顷。该PLTU的容量为2x300兆瓦。由于煤中的碳含量与空气中的氧气发生反应而发生自燃。Banten 2 Labuan OMU PLTU库存出现的问题是由于FIFO(先进先出)管理系统的无效实施而经常发生自燃。在LRC的12个1号库点和MRC的12个2号库点进行了堆温数据采样技术,观测了煤堆的西、南、东三面。其中样品测量的每边厚度分别为1、3、5和7米,0米点取自库存的底层。查看一定厚度下各测点温度与路堤时间、路堤尺寸的对比。从所进行的所有研究中,库存有2库存煤,库存1 LRC(低等级卡路里),质量为4200。1号物料高度10.9米,2号物料高度9.6米,1号物料坡度55.6°,52.5°。库存1的温升为3.4°C/天,库存2的温升为3.2°C/天。预估1号库区自燃时间为4天,2号库区自燃时间为5天,即2号库区自燃时间比1号库区自燃时间长1天。PLTU Banten 2 Labuan OMU merupakan suatu perusahaan pembangkit listrik dengan sumber bahan bakar utama batubara dengan kalori 4000-4900 Kcal/kg memiliki luas lahan 64,45 Ha。PLTU ini memoriliki kapasitas listrik yang dihasilkan 2x300 MW自燃terjadi karena adanya reaksi kandungan碳pada batubara dengan gas oksigen di udara。Permasalahan yang muncual库存PLTU Banten 2 Labuan OMU ini,服务于terjadinya swabakar yang disebabkan karena kurang efektifnya penpenjapan系统管理FIFO(先进先出)。Teknis pengambilan sempel数据suhu timunan ini dilakukan sebanyak 12 titik库存1 LRC和12 titik库存2 MRC, pengamatan padga sisi timunan batubara yitu sisi barat, selatan dan timur。迪马纳设置了塞西企鹅标本迪马纳-帕达-克特巴兰1、3、5、7米,丹达-蒂克- 0米,迪马纳-帕达-兰塔-达-库。Untuk melbingingan和suhu terhadap lama timunan和dimensi timunan pata setap titik penguins和dengan ketebalan tertentu。达里seluruh penelitian yang dilakukan kondisi储备memoriliki 2 timbunan batubara,储备LRC(低阶热量)dengan kualitas 4200。科庆县木桶桶10、9米木桶桶1丹9、6米木桶桶2、科庆县木桶55、6°木桶桶1丹52,5°。Untuk库存1 memiliki kenaikan suhu yitu 3,4°C/Hari dan Untuk库存2 memiliki kenaikan suhu yitu 3,2。估计swabakar untuk储备1 adalah 4 hari, sedangkan untuk储备2 adalah 5 hari, artinya kualitas batubara mempengaruhi自燃yang mana储备2 lebih lama 1 hari dari储备1
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Manajemen Stockpile untuk Mencegah Terjadinya Self-Combustion di PLTU Banten 2 Labuan OMU
Abstract. PLTU Banten 2 Labuan OMU is a power plant company with the main fuel source being coal with calories 4000-4900 Kcal/kg with a land area of ​​64.45 Ha. This PLTU has a capacity of 2x300 MW of electricity. Self-combustion occurs due to the reaction of the carbon content in coal with oxygen gas in the air. The problem that arises in the Banten 2 Labuan OMU PLTU stockpile is the frequent occurrence of self-burning due to the ineffective implementation of the FIFO (Frist In Frist Out) management system. The sampling technique for stockpile temperature data was carried out at 12 stockpile 1 points of LRC and 12 points of stockpile 2 MRC, observing three sides of the coal pile, namely the west, south and east sides. Where each side of the sample measurement is taken at a thickness of 1, 3, 5, and 7 meters and the 0 meter point is taken from the ground floor of the stockpile. To see the comparison of temperature to embankment time and embankment dimensions at each measurement point with a certain thickness. From all the research conducted, the stockpile had 2 stockpiles of coal, stockpile 1 LRC (Low Rank Calorie) with quality <4200 and stockpile 2 MRC (Medium Rank Calorie) with quality >4200. The height of the stockpile reaches 10.9 meters for stock 1 and 9.6 meters for stock 2, the slope angle of the stockpile is 55.6° for stock 1 and 52.5°. Stockpile 1 has a temperature rise of 3.4°C/day and stockpile 2 has a temperature rise of 3.2. The estimated self-combustion for stockpile 1 is 4 days, while for stockpile 2 it is 5 days, meaning that the coal quality affects self-combustion where stockpile 2 takes 1 day longer than stockpile 1 Abstrak. PLTU Banten 2 Labuan OMU merupakan suatu perusahaan pembangkit listrik dengan sumber  bahan bakar utama batubara dengan kalori 4000-4900 Kcal/kg memiliki luas lahan 64,45 Ha. PLTU ini memiliki kapasitas listrik yang dihasilkan 2x300 MW Self-Combustion terjadi karena adanya reaksi kandungan karbon pada batubara dengan gas oksigen di udara. Permasalahan yang muncul pada stockpile PLTU Banten 2 Labuan OMU ini, sering terjadinya swabakar yang disebabkan karena kurang efektifnya penerapan sistem manajemen FIFO (Frist In Frist Out). Teknis pengambilan sempel data suhu timbunan ini dilakukan sebanyak 12 titik stockpile 1 LRC dan 12 titik stockpile 2 MRC, pengamatan pada tiga sisi timbunan batubara yaitu sisi barat, selatan dan timur. Di mana setiap sisi pengukuran sampel diambil pada ketebalan 1, 3, 5, dan 7 meter dan titik 0 meter pengukuran dilakukan dari lantai dasar stockpile. Untuk melihat perbandingan suhu terhadap lama timbunan dan dimensi timbunan pada setiap titik pengukuran dengan ketebalan tertentu. Dari seluruh penelitian yang dilakukan kondisi stockpile memiliki 2 timbunan batubara, stockpile 1 LRC (Low Rank Calorie) dengan kualitas <4200 dan stockpile 2 MRC (Medium Rank Calorie) dengan kualitas >4200. Ketinggian timbunan mencapai 10,9 meter untuk stock 1 dan 9,6 meter untuk stock 2, sudut kemiringan timbunan 55,6° untuk Stock 1 dan 52,5°. Untuk stockpile 1 memiliki kenaikan suhu yaitu 3,4°C/Hari dan untuk stockpile 2 memiliki kenaikan suhu yaitu 3,2. Estimasi swabakar untuk stockpile 1 adalah 4 hari, sedangkan untuk Stockpile 2 adalah 5 hari, artinya kualitas batubara mempengaruhi Self-Combustion yang mana Stockpile 2 lebih lama 1 hari dari Stockpile 1
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信