{"title":"Pradhan Mantri Gram Sadak Yojana农村公路建设项目公路216号(A)","authors":"Goutam Dutta","doi":"10.1108/case.iima.2020.000169","DOIUrl":null,"url":null,"abstract":"S. R. Pandey, Superintending Engineer (SE), Rural Roads Department, Bihar wanted to have a meeting of all the agencies involved, including his other engineers, the contractors to discuss his village road-making project in Pradhan Mantri Gram Sadak Yojona (PMGSY). This case discusses how the concept of work breakdown is used to subdivide all the activities of road-making into different sub activities (earthwork, bridgework, roadwork and other miscellaneous activities) in different levels.","PeriodicalId":433867,"journal":{"name":"Indian Institute of Management Ahmedabad","volume":"17 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-07-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Pradhan Mantri Gram Sadak Yojana Rural Road Construction Project Road No 216 (A)\",\"authors\":\"Goutam Dutta\",\"doi\":\"10.1108/case.iima.2020.000169\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"S. R. Pandey, Superintending Engineer (SE), Rural Roads Department, Bihar wanted to have a meeting of all the agencies involved, including his other engineers, the contractors to discuss his village road-making project in Pradhan Mantri Gram Sadak Yojona (PMGSY). This case discusses how the concept of work breakdown is used to subdivide all the activities of road-making into different sub activities (earthwork, bridgework, roadwork and other miscellaneous activities) in different levels.\",\"PeriodicalId\":433867,\"journal\":{\"name\":\"Indian Institute of Management Ahmedabad\",\"volume\":\"17 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-07-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Indian Institute of Management Ahmedabad\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1108/case.iima.2020.000169\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Indian Institute of Management Ahmedabad","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/case.iima.2020.000169","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
摘要
比哈尔邦农村公路部监督工程师S. R. Pandey希望召集所有相关机构开会,包括他的其他工程师和承包商,讨论他在Pradhan Mantri Gram Sadak Yojona (PMGSY)的乡村道路建设项目。本案例讨论了如何使用工作分解的概念将所有筑路活动细分为不同层次的不同子活动(土方工程、桥梁工程、道路工程和其他杂项活动)。
Pradhan Mantri Gram Sadak Yojana Rural Road Construction Project Road No 216 (A)
S. R. Pandey, Superintending Engineer (SE), Rural Roads Department, Bihar wanted to have a meeting of all the agencies involved, including his other engineers, the contractors to discuss his village road-making project in Pradhan Mantri Gram Sadak Yojona (PMGSY). This case discusses how the concept of work breakdown is used to subdivide all the activities of road-making into different sub activities (earthwork, bridgework, roadwork and other miscellaneous activities) in different levels.