一般耦合任务调度问题的二叉搜索方法

M. Khatami, A. Salehipour
{"title":"一般耦合任务调度问题的二叉搜索方法","authors":"M. Khatami, A. Salehipour","doi":"10.2139/ssrn.3451871","DOIUrl":null,"url":null,"abstract":"The coupled task scheduling problem aims to schedule a set of jobs, each with at least two tasks and there is an exact delay period between two consecutive tasks, on a set of machines to optimize a performance criterion. We study the problem of scheduling a set of coupled jobs to be processed on a single machine with the objective of minimizing the makespan, which is known to be strongly NP-hard. We obtain competitive lower bounds for the problem through different procedures, including solving 0-1 knapsack problems. We obtain an upper bound by applying a heuristic algorithm. We then propose a binary search heuristic algorithm for the coupled task scheduling problem. We perform extensive computational experiments and show that the proposed method is able to obtain quality solutions. The results also indicate that the proposed solution method outperforms the standard exact solver Gurobi.","PeriodicalId":275253,"journal":{"name":"Operations Research eJournal","volume":"40 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-09-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A Binary Search Method for the General Coupled Task Scheduling Problem\",\"authors\":\"M. Khatami, A. Salehipour\",\"doi\":\"10.2139/ssrn.3451871\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The coupled task scheduling problem aims to schedule a set of jobs, each with at least two tasks and there is an exact delay period between two consecutive tasks, on a set of machines to optimize a performance criterion. We study the problem of scheduling a set of coupled jobs to be processed on a single machine with the objective of minimizing the makespan, which is known to be strongly NP-hard. We obtain competitive lower bounds for the problem through different procedures, including solving 0-1 knapsack problems. We obtain an upper bound by applying a heuristic algorithm. We then propose a binary search heuristic algorithm for the coupled task scheduling problem. We perform extensive computational experiments and show that the proposed method is able to obtain quality solutions. The results also indicate that the proposed solution method outperforms the standard exact solver Gurobi.\",\"PeriodicalId\":275253,\"journal\":{\"name\":\"Operations Research eJournal\",\"volume\":\"40 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-09-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Operations Research eJournal\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2139/ssrn.3451871\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Operations Research eJournal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2139/ssrn.3451871","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

耦合任务调度问题的目的是在一组机器上调度一组作业,每个作业至少有两个任务,并且两个连续任务之间存在精确的延迟时间,以优化性能标准。我们研究了以最小化完工时间为目标,在一台机器上调度一组耦合作业的问题,这被称为强np困难问题。通过求解0-1背包问题,得到了问题的竞争下界。我们用启发式算法求出了一个上界。然后,我们提出了一种二元搜索启发式算法来解决耦合任务调度问题。我们进行了大量的计算实验,并表明所提出的方法能够获得高质量的解。结果还表明,所提出的求解方法优于标准精确求解器Gurobi。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A Binary Search Method for the General Coupled Task Scheduling Problem
The coupled task scheduling problem aims to schedule a set of jobs, each with at least two tasks and there is an exact delay period between two consecutive tasks, on a set of machines to optimize a performance criterion. We study the problem of scheduling a set of coupled jobs to be processed on a single machine with the objective of minimizing the makespan, which is known to be strongly NP-hard. We obtain competitive lower bounds for the problem through different procedures, including solving 0-1 knapsack problems. We obtain an upper bound by applying a heuristic algorithm. We then propose a binary search heuristic algorithm for the coupled task scheduling problem. We perform extensive computational experiments and show that the proposed method is able to obtain quality solutions. The results also indicate that the proposed solution method outperforms the standard exact solver Gurobi.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信