评价通过"流程工厂"在健康保护领域培养项目管理技能的培训效率

V. Frantseva
{"title":"评价通过\"流程工厂\"在健康保护领域培养项目管理技能的培训效率","authors":"V. Frantseva","doi":"10.24075/mtcpe.2022.024","DOIUrl":null,"url":null,"abstract":"The material presents the results of assessing the effectiveness of the «process factories» for the formation of project management skills in the field of health protection in the development of lean manufacturing technology. In order to assess the efficiency ratio, the process of conducting an initial appointment in the office of a general practitioner and a pediatrician was timed before and 7 months after graduation. It was revealed that the use of the “process factory” in the development of lean production technology allows to increase the labor productivity of specialists at the workplace by an average of 6.2% compared to specialists who have mastered the tools of lean production without fixing them at the “process factory”.","PeriodicalId":101651,"journal":{"name":"Methodology and technology of continuing professional education","volume":"390 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-03-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Evaluation of the efficiency of training on the formation of project management skills in the sphere of health protection through the «factory of processes»\",\"authors\":\"V. Frantseva\",\"doi\":\"10.24075/mtcpe.2022.024\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The material presents the results of assessing the effectiveness of the «process factories» for the formation of project management skills in the field of health protection in the development of lean manufacturing technology. In order to assess the efficiency ratio, the process of conducting an initial appointment in the office of a general practitioner and a pediatrician was timed before and 7 months after graduation. It was revealed that the use of the “process factory” in the development of lean production technology allows to increase the labor productivity of specialists at the workplace by an average of 6.2% compared to specialists who have mastered the tools of lean production without fixing them at the “process factory”.\",\"PeriodicalId\":101651,\"journal\":{\"name\":\"Methodology and technology of continuing professional education\",\"volume\":\"390 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-03-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Methodology and technology of continuing professional education\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.24075/mtcpe.2022.024\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Methodology and technology of continuing professional education","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24075/mtcpe.2022.024","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

该材料介绍了评估"过程工厂"的有效性的结果,以形成精益生产技术发展中健康保护领域的项目管理技能。为了评估效率比,在全科医生和儿科医生的办公室进行初次预约的过程分别在毕业前和毕业后7个月进行。据透露,在精益生产技术的发展中,使用“过程工厂”可以使工作场所专家的劳动生产率比掌握了精益生产工具而没有在“过程工厂”中固定的专家平均提高6.2%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Evaluation of the efficiency of training on the formation of project management skills in the sphere of health protection through the «factory of processes»
The material presents the results of assessing the effectiveness of the «process factories» for the formation of project management skills in the field of health protection in the development of lean manufacturing technology. In order to assess the efficiency ratio, the process of conducting an initial appointment in the office of a general practitioner and a pediatrician was timed before and 7 months after graduation. It was revealed that the use of the “process factory” in the development of lean production technology allows to increase the labor productivity of specialists at the workplace by an average of 6.2% compared to specialists who have mastered the tools of lean production without fixing them at the “process factory”.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信