在铁路严重中断的情况下,重新分配铁路侧线

Rui Wang, Y. Bao, Weining Hao
{"title":"在铁路严重中断的情况下,重新分配铁路侧线","authors":"Rui Wang, Y. Bao, Weining Hao","doi":"10.1109/ICIRT.2018.8641521","DOIUrl":null,"url":null,"abstract":"The arrangement of siding tracks in a station plays an important part in the station operation plan, especially when some trains are delayed. Due to speed limitation command by the dispatcher, trains are usually delayed getting into a station. When it occurs, the train may not reach its original siding track at its scheduled timetable and will have to be reallocated at a new time point, either to its original siding track or another. Then, the train‘s practical arrival time will further cause conflicts with other trains for occupying the same resources. Therefore, this paper focuses on the problem of station siding tracks reallocation after a delay, of which the first issue is to decide the siding tracks reallocated to delayed trains; the second one is to reschedule the arrival and departure time of trains passing through the station. A mixed-integer linear model is proposed to tackle the issue and real-world experiments based on Shijiazhuang (SJZ) high-speed railway passenger station are carried out to demonstrate the validity and efficiency of the model.","PeriodicalId":202415,"journal":{"name":"2018 International Conference on Intelligent Rail Transportation (ICIRT)","volume":"31 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Reallocating siding tracks in a railway station under severe disruptions\",\"authors\":\"Rui Wang, Y. Bao, Weining Hao\",\"doi\":\"10.1109/ICIRT.2018.8641521\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The arrangement of siding tracks in a station plays an important part in the station operation plan, especially when some trains are delayed. Due to speed limitation command by the dispatcher, trains are usually delayed getting into a station. When it occurs, the train may not reach its original siding track at its scheduled timetable and will have to be reallocated at a new time point, either to its original siding track or another. Then, the train‘s practical arrival time will further cause conflicts with other trains for occupying the same resources. Therefore, this paper focuses on the problem of station siding tracks reallocation after a delay, of which the first issue is to decide the siding tracks reallocated to delayed trains; the second one is to reschedule the arrival and departure time of trains passing through the station. A mixed-integer linear model is proposed to tackle the issue and real-world experiments based on Shijiazhuang (SJZ) high-speed railway passenger station are carried out to demonstrate the validity and efficiency of the model.\",\"PeriodicalId\":202415,\"journal\":{\"name\":\"2018 International Conference on Intelligent Rail Transportation (ICIRT)\",\"volume\":\"31 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2018 International Conference on Intelligent Rail Transportation (ICIRT)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICIRT.2018.8641521\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 International Conference on Intelligent Rail Transportation (ICIRT)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICIRT.2018.8641521","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

站内侧线的布置在车站运营计划中起着重要的作用,特别是在一些列车延误的情况下。由于调度员的速度限制命令,火车通常会延迟进站。当这种情况发生时,列车可能无法在预定的时间表到达原来的侧线轨道,必须在一个新的时间点重新分配到原来的侧线轨道或另一个。然后,列车的实际到达时间将进一步引起与其他列车占用相同资源的冲突。因此,本文主要研究延误后车站侧线轨道的重新分配问题,其中首先是确定重新分配给延误列车的侧线轨道;二是重新安排通过该站的列车到达和离开的时间。提出了一种混合整数线性模型来解决这一问题,并以石家庄高铁客运站为例进行了实际实验,验证了该模型的有效性和高效性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Reallocating siding tracks in a railway station under severe disruptions
The arrangement of siding tracks in a station plays an important part in the station operation plan, especially when some trains are delayed. Due to speed limitation command by the dispatcher, trains are usually delayed getting into a station. When it occurs, the train may not reach its original siding track at its scheduled timetable and will have to be reallocated at a new time point, either to its original siding track or another. Then, the train‘s practical arrival time will further cause conflicts with other trains for occupying the same resources. Therefore, this paper focuses on the problem of station siding tracks reallocation after a delay, of which the first issue is to decide the siding tracks reallocated to delayed trains; the second one is to reschedule the arrival and departure time of trains passing through the station. A mixed-integer linear model is proposed to tackle the issue and real-world experiments based on Shijiazhuang (SJZ) high-speed railway passenger station are carried out to demonstrate the validity and efficiency of the model.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信