{"title":"应用数学规划方法实现了煤气管道主管道线性部分维修恢复工作日历计划编制的自动化","authors":"P. Kovalevsky","doi":"10.33285/2782-604x-2023-1(594)-13-19","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":228311,"journal":{"name":"Automation and informatization of the fuel and energy complex","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Automation of a calendar plan construction for carrying out repair and restoration work on the linear part of the main gas pipeline applying mathematical programming methods\",\"authors\":\"P. Kovalevsky\",\"doi\":\"10.33285/2782-604x-2023-1(594)-13-19\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":228311,\"journal\":{\"name\":\"Automation and informatization of the fuel and energy complex\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Automation and informatization of the fuel and energy complex\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.33285/2782-604x-2023-1(594)-13-19\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Automation and informatization of the fuel and energy complex","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33285/2782-604x-2023-1(594)-13-19","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Automation of a calendar plan construction for carrying out repair and restoration work on the linear part of the main gas pipeline applying mathematical programming methods