{"title":"大坝影响下点坝发育特征——以克罗地亚Sigetec Dráva河为例","authors":"T. Kiss, M. Balogh","doi":"10.1515/jengeo-2015-0003","DOIUrl":null,"url":null,"abstract":"Abstract Before the extensive engineering works the Dráva River had braided pattern. However in the 19-20th centuries river regulation works became widespread, thus meanders were cut off, side-channels were blocked and hydroelectric power plants were completed. These human impacts significantly changed the hydro-morphology of the river. The aim of the present research is to analyse meander development and the formation of a point-bar from the point of view of indirect human impact. Series of maps and ortho-photos representing the period of 1870-2011 were used to quantify the longterm meander development, rate of bank erosion and point-bar aggradation. Besides, at-a-site erosion measurements and grain-size analysis were also carried out. As the result of reservoir constructions during the last 145 years floods almost totally disappeared, as their return period increased to 5-15 years and their duration decreased to 1-2 days. The channel pattern had changed from braided to sinuous and to meandering, thus the rate of bank erosion increased from 3.7 m/y to 32 m/y. On the upstream part of the point-bar the maximum grain size is 49.7-83.4 mm and the mean particle size is 7.6 mm, whilst on the downstream part the maximum grain size was only 39.7-39.9 mm and mean sediment size decreased to 6.1 mm. Due to the coarse sediment supply and the decreasing stream energy the point-bars develop quickly upstream and laterally too.","PeriodicalId":115431,"journal":{"name":"Journal of Environmental Geography","volume":"29 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"18","resultStr":"{\"title\":\"Characteristics of Point-Bar Development under the Influence of a Dam: Case Study on the Dráva River at Sigetec, Croatia\",\"authors\":\"T. Kiss, M. Balogh\",\"doi\":\"10.1515/jengeo-2015-0003\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract Before the extensive engineering works the Dráva River had braided pattern. However in the 19-20th centuries river regulation works became widespread, thus meanders were cut off, side-channels were blocked and hydroelectric power plants were completed. These human impacts significantly changed the hydro-morphology of the river. The aim of the present research is to analyse meander development and the formation of a point-bar from the point of view of indirect human impact. Series of maps and ortho-photos representing the period of 1870-2011 were used to quantify the longterm meander development, rate of bank erosion and point-bar aggradation. Besides, at-a-site erosion measurements and grain-size analysis were also carried out. As the result of reservoir constructions during the last 145 years floods almost totally disappeared, as their return period increased to 5-15 years and their duration decreased to 1-2 days. The channel pattern had changed from braided to sinuous and to meandering, thus the rate of bank erosion increased from 3.7 m/y to 32 m/y. On the upstream part of the point-bar the maximum grain size is 49.7-83.4 mm and the mean particle size is 7.6 mm, whilst on the downstream part the maximum grain size was only 39.7-39.9 mm and mean sediment size decreased to 6.1 mm. Due to the coarse sediment supply and the decreasing stream energy the point-bars develop quickly upstream and laterally too.\",\"PeriodicalId\":115431,\"journal\":{\"name\":\"Journal of Environmental Geography\",\"volume\":\"29 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-07-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"18\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Environmental Geography\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1515/jengeo-2015-0003\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Environmental Geography","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1515/jengeo-2015-0003","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 18

摘要

在大规模工程之前,Dráva河呈辫状。然而,在19-20世纪,河流治理工程变得普遍,因此曲流被切断,侧渠被堵塞,水力发电厂建成。这些人类活动极大地改变了河流的水文形态。本研究的目的是从人类间接影响的角度分析曲流的发展和点坝的形成。利用1870-2011年的一系列地图和正射影照片,量化了河曲的长期发展、河岸侵蚀率和点坝淤积。此外,还进行了现场侵蚀测量和粒度分析。由于近145年来的水库建设,洪涝灾害几乎完全消失,其复发周期增加到5-15年,持续时间减少到1-2天。河道形态由辫状河道变为蜿蜒河道再变为蜿蜒河道,河岸侵蚀速率由3.7 m/年增加到32 m/年。点坝上游最大粒径为49.7 ~ 83.4 mm,平均粒径为7.6 mm,下游最大粒径仅为39.7 ~ 39.9 mm,平均泥沙粒径降至6.1 mm。由于泥沙供给粗大,水流能量下降,点坝在上游和横向也迅速发育。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Characteristics of Point-Bar Development under the Influence of a Dam: Case Study on the Dráva River at Sigetec, Croatia
Abstract Before the extensive engineering works the Dráva River had braided pattern. However in the 19-20th centuries river regulation works became widespread, thus meanders were cut off, side-channels were blocked and hydroelectric power plants were completed. These human impacts significantly changed the hydro-morphology of the river. The aim of the present research is to analyse meander development and the formation of a point-bar from the point of view of indirect human impact. Series of maps and ortho-photos representing the period of 1870-2011 were used to quantify the longterm meander development, rate of bank erosion and point-bar aggradation. Besides, at-a-site erosion measurements and grain-size analysis were also carried out. As the result of reservoir constructions during the last 145 years floods almost totally disappeared, as their return period increased to 5-15 years and their duration decreased to 1-2 days. The channel pattern had changed from braided to sinuous and to meandering, thus the rate of bank erosion increased from 3.7 m/y to 32 m/y. On the upstream part of the point-bar the maximum grain size is 49.7-83.4 mm and the mean particle size is 7.6 mm, whilst on the downstream part the maximum grain size was only 39.7-39.9 mm and mean sediment size decreased to 6.1 mm. Due to the coarse sediment supply and the decreasing stream energy the point-bars develop quickly upstream and laterally too.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信