海港集装箱码头列车负荷规划问题的建模与求解

D. Ambrosino, A. Bramardi, Marco Pucciano, S. Sacone, S. Siri
{"title":"海港集装箱码头列车负荷规划问题的建模与求解","authors":"D. Ambrosino, A. Bramardi, Marco Pucciano, S. Sacone, S. Siri","doi":"10.1109/CASE.2011.6042439","DOIUrl":null,"url":null,"abstract":"In this paper we present two mathematical formulations and a heuristic approach for the train load planning problem of import containers at a seaport container terminal. The problem consists of determining how to assign a set of containers of different length and weight to the wagons of a train in order to satisfy capacity constraints of both the wagons and the train, while minimizing the rehandling operations in the stocking area where containers are waiting for being loaded on trains and maximizing the train utilization. Some computational results will be reported in the paper in which the heuristic approach is compared with the solution of the mathematical programming formulation.","PeriodicalId":236208,"journal":{"name":"2011 IEEE International Conference on Automation Science and Engineering","volume":"88 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-10-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"36","resultStr":"{\"title\":\"Modeling and solving the train load planning problem in seaport container terminals\",\"authors\":\"D. Ambrosino, A. Bramardi, Marco Pucciano, S. Sacone, S. Siri\",\"doi\":\"10.1109/CASE.2011.6042439\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this paper we present two mathematical formulations and a heuristic approach for the train load planning problem of import containers at a seaport container terminal. The problem consists of determining how to assign a set of containers of different length and weight to the wagons of a train in order to satisfy capacity constraints of both the wagons and the train, while minimizing the rehandling operations in the stocking area where containers are waiting for being loaded on trains and maximizing the train utilization. Some computational results will be reported in the paper in which the heuristic approach is compared with the solution of the mathematical programming formulation.\",\"PeriodicalId\":236208,\"journal\":{\"name\":\"2011 IEEE International Conference on Automation Science and Engineering\",\"volume\":\"88 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-10-13\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"36\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2011 IEEE International Conference on Automation Science and Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CASE.2011.6042439\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 IEEE International Conference on Automation Science and Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CASE.2011.6042439","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 36

摘要

本文提出了海港集装箱码头进口集装箱列车负荷规划问题的两个数学公式和一种启发式方法。该问题包括如何在满足车厢和列车容量约束的前提下,将一组不同长度和重量的集装箱分配给列车车厢,同时使等待装载集装箱的库存区重新装卸作业最小化,使列车利用率最大化。本文将报告一些计算结果,并将启发式方法与数学规划公式的解进行比较。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Modeling and solving the train load planning problem in seaport container terminals
In this paper we present two mathematical formulations and a heuristic approach for the train load planning problem of import containers at a seaport container terminal. The problem consists of determining how to assign a set of containers of different length and weight to the wagons of a train in order to satisfy capacity constraints of both the wagons and the train, while minimizing the rehandling operations in the stocking area where containers are waiting for being loaded on trains and maximizing the train utilization. Some computational results will be reported in the paper in which the heuristic approach is compared with the solution of the mathematical programming formulation.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信