金属管状桩荷载转移与基础设置的演变:案例研究

Milena Cardoso de Freitas Murari, Cristina Tsuha, Nelson Aoki, Heber Henrique Penow Campos, Inácio Kotovicz
{"title":"金属管状桩荷载转移与基础设置的演变:案例研究","authors":"Milena Cardoso de Freitas Murari, Cristina Tsuha, Nelson Aoki, Heber Henrique Penow Campos, Inácio Kotovicz","doi":"10.4322/cobramseg.2022.0330","DOIUrl":null,"url":null,"abstract":"fundações cravadas frequentemente tempo, cravação, cicatrização ou set-up . Para quantificar o ganho de capacidade carga, é variável acordo instalação e geometria estaca, ser utilizados ensaios de carregamento dinâmico executados em diferentes intervalos de tempo após o término da cravação das estacas. Além de mostrar ABSTRACT: The load capacity of driven piles frequently increases with time after pile installation and this phenomenon is known as aging or set-up. To quantify the gain in pile capacity, which depends on the soil type and pile geometry, dynamic loading tests can be performed at different time after the pile installation. Besides providing information on the variation of pile capacity with time, allowing the understanding of the foundation behavior under service loads, these tests can show the evolution of the load transfer along the pile length at different times after installation. The aim of this study is to present the set-up effect on the load capacity of a steel pipe pile installed in predominantly sandy soil. In this study, results of dynamic load tests with increasing energy are presented for a steel pipe pile at different time intervals after installation, 0 min, 105 min, 345 min, and 6000 min. The results show that after 100 h of pile installation, the shaft resistance has increased considerably. The set-up effect on the pile studied in sandy soils was pronounced in a few days after its installation. In addition, the results of the dynamic load tests showed excellent agreement with the results of the static load test performed on the pile after the dynamic tests.","PeriodicalId":206776,"journal":{"name":"Congresso Brasileiro de Mecânica dos Solos e Engenharia Geotécnica","volume":"144 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Evolução da transferência de carga e set-up de fundações por estacas tubulares metálicas cravadas: estudo de caso\",\"authors\":\"Milena Cardoso de Freitas Murari, Cristina Tsuha, Nelson Aoki, Heber Henrique Penow Campos, Inácio Kotovicz\",\"doi\":\"10.4322/cobramseg.2022.0330\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"fundações cravadas frequentemente tempo, cravação, cicatrização ou set-up . Para quantificar o ganho de capacidade carga, é variável acordo instalação e geometria estaca, ser utilizados ensaios de carregamento dinâmico executados em diferentes intervalos de tempo após o término da cravação das estacas. Além de mostrar ABSTRACT: The load capacity of driven piles frequently increases with time after pile installation and this phenomenon is known as aging or set-up. To quantify the gain in pile capacity, which depends on the soil type and pile geometry, dynamic loading tests can be performed at different time after the pile installation. Besides providing information on the variation of pile capacity with time, allowing the understanding of the foundation behavior under service loads, these tests can show the evolution of the load transfer along the pile length at different times after installation. The aim of this study is to present the set-up effect on the load capacity of a steel pipe pile installed in predominantly sandy soil. In this study, results of dynamic load tests with increasing energy are presented for a steel pipe pile at different time intervals after installation, 0 min, 105 min, 345 min, and 6000 min. The results show that after 100 h of pile installation, the shaft resistance has increased considerably. The set-up effect on the pile studied in sandy soils was pronounced in a few days after its installation. In addition, the results of the dynamic load tests showed excellent agreement with the results of the static load test performed on the pile after the dynamic tests.\",\"PeriodicalId\":206776,\"journal\":{\"name\":\"Congresso Brasileiro de Mecânica dos Solos e Engenharia Geotécnica\",\"volume\":\"144 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Congresso Brasileiro de Mecânica dos Solos e Engenharia Geotécnica\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4322/cobramseg.2022.0330\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Congresso Brasileiro de Mecânica dos Solos e Engenharia Geotécnica","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4322/cobramseg.2022.0330","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

fundacoes cravadas frequentemente节奏、cravacao cicatrizacao或者设置。从数量上看,从容量上看, variável从安装上看,从空间上看,从空间上看,从空间上看,从空间上看,从空间上看,从空间上看,从空间上看,从空间上看,从空间上看,从空间上看,从空间上看,从空间上看,从空间上看,从空间上看,从空间上看,都是不同的。摘要:打入桩安装后,其承载能力往往随着时间的推移而增加,这种现象被称为老化或变形。为了量化桩承载力的增加,这取决于土体类型和桩的几何形状,可以在桩安装后的不同时间进行动荷载试验。这些试验除了提供桩容随时间变化的信息,使人们能够了解基础在使用荷载作用下的行为,还可以显示荷载在安装后不同时间沿桩长传递的演变。本文的研究目的是探讨在沙质土为主的环境中,设置对钢管桩承载能力的影响。本文对某钢管桩进行了安装后0 min、105 min、345 min、6000 min等不同时间间隔的能量递增动荷载试验结果,结果表明:桩安装100 h后,桩身阻力明显增大。砂质土中所研究的桩在安装后几天内,桩身效应就显现出来了。此外,动荷载试验结果与动荷载试验后进行的静荷载试验结果吻合良好。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Evolução da transferência de carga e set-up de fundações por estacas tubulares metálicas cravadas: estudo de caso
fundações cravadas frequentemente tempo, cravação, cicatrização ou set-up . Para quantificar o ganho de capacidade carga, é variável acordo instalação e geometria estaca, ser utilizados ensaios de carregamento dinâmico executados em diferentes intervalos de tempo após o término da cravação das estacas. Além de mostrar ABSTRACT: The load capacity of driven piles frequently increases with time after pile installation and this phenomenon is known as aging or set-up. To quantify the gain in pile capacity, which depends on the soil type and pile geometry, dynamic loading tests can be performed at different time after the pile installation. Besides providing information on the variation of pile capacity with time, allowing the understanding of the foundation behavior under service loads, these tests can show the evolution of the load transfer along the pile length at different times after installation. The aim of this study is to present the set-up effect on the load capacity of a steel pipe pile installed in predominantly sandy soil. In this study, results of dynamic load tests with increasing energy are presented for a steel pipe pile at different time intervals after installation, 0 min, 105 min, 345 min, and 6000 min. The results show that after 100 h of pile installation, the shaft resistance has increased considerably. The set-up effect on the pile studied in sandy soils was pronounced in a few days after its installation. In addition, the results of the dynamic load tests showed excellent agreement with the results of the static load test performed on the pile after the dynamic tests.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信