{"title":"基于离散微分动态规划-渐进优化算法组合方法的水电站优化调度研究","authors":"Xuan Yingji, Mei Yadong, Xu Jiangsong","doi":"10.1109/SERA.2009.26","DOIUrl":null,"url":null,"abstract":"The progressive optimization algorithm over-depends on the initial state, it needs to assume certain different types of initial test strategies and corresponding initial test paths, the calculation process repeats 2 to 5 times. Considering the shortfalls mentioned above, this paper presents discrete differential dynamic programming-progressive optimum combination method which is applied in the operation of hydropower station and designs a solution based on the method to optimize the operation of hydropower stations. Calculation example shows that this method is effective, highly reliable in global optimization and full of prospects.","PeriodicalId":333607,"journal":{"name":"2009 Seventh ACIS International Conference on Software Engineering Research, Management and Applications","volume":"20 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-12-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":"{\"title\":\"Research of Hydropower Stations Optimal Operation Based on the Discrete Differential Dynamic Programming - Progressive Optimization Algorithm Combination Method\",\"authors\":\"Xuan Yingji, Mei Yadong, Xu Jiangsong\",\"doi\":\"10.1109/SERA.2009.26\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The progressive optimization algorithm over-depends on the initial state, it needs to assume certain different types of initial test strategies and corresponding initial test paths, the calculation process repeats 2 to 5 times. Considering the shortfalls mentioned above, this paper presents discrete differential dynamic programming-progressive optimum combination method which is applied in the operation of hydropower station and designs a solution based on the method to optimize the operation of hydropower stations. Calculation example shows that this method is effective, highly reliable in global optimization and full of prospects.\",\"PeriodicalId\":333607,\"journal\":{\"name\":\"2009 Seventh ACIS International Conference on Software Engineering Research, Management and Applications\",\"volume\":\"20 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-12-02\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"7\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2009 Seventh ACIS International Conference on Software Engineering Research, Management and Applications\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/SERA.2009.26\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 Seventh ACIS International Conference on Software Engineering Research, Management and Applications","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SERA.2009.26","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7

摘要

渐进式优化算法过度依赖于初始状态,需要假设某些不同类型的初始测试策略和相应的初始测试路径,计算过程重复2 ~ 5次。针对上述不足,本文提出了将离散微分动态规划-递进优化组合方法应用于水电站运行,并在此基础上设计了水电站运行优化方案。算例表明,该方法是有效的,具有较高的全局优化可靠性,具有广阔的应用前景。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Research of Hydropower Stations Optimal Operation Based on the Discrete Differential Dynamic Programming - Progressive Optimization Algorithm Combination Method
The progressive optimization algorithm over-depends on the initial state, it needs to assume certain different types of initial test strategies and corresponding initial test paths, the calculation process repeats 2 to 5 times. Considering the shortfalls mentioned above, this paper presents discrete differential dynamic programming-progressive optimum combination method which is applied in the operation of hydropower station and designs a solution based on the method to optimize the operation of hydropower stations. Calculation example shows that this method is effective, highly reliable in global optimization and full of prospects.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信