{"title":"现场钻井的概念方法-最小化风险和经济成本","authors":"A. Freze","doi":"10.2118/196906-ms","DOIUrl":null,"url":null,"abstract":"\n The existing, until recently, design system provided no connection of the surface and underground parts of the field in a complex, as a result of which further implementation of design solutions had problems with placement of well clusters on the surface and well profiles drilling. The introduction of a conceptual approach in the design of the field allows you to accurately determine and optimize the cost of construction of wells and construction of oilfield at the design stage.","PeriodicalId":143392,"journal":{"name":"Day 1 Tue, October 22, 2019","volume":"56 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-10-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Conceptual Approach to Field Drilling – Minimizing Risks And Economic Costs\",\"authors\":\"A. Freze\",\"doi\":\"10.2118/196906-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n The existing, until recently, design system provided no connection of the surface and underground parts of the field in a complex, as a result of which further implementation of design solutions had problems with placement of well clusters on the surface and well profiles drilling. The introduction of a conceptual approach in the design of the field allows you to accurately determine and optimize the cost of construction of wells and construction of oilfield at the design stage.\",\"PeriodicalId\":143392,\"journal\":{\"name\":\"Day 1 Tue, October 22, 2019\",\"volume\":\"56 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-10-22\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 1 Tue, October 22, 2019\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/196906-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 1 Tue, October 22, 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/196906-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Conceptual Approach to Field Drilling – Minimizing Risks And Economic Costs
The existing, until recently, design system provided no connection of the surface and underground parts of the field in a complex, as a result of which further implementation of design solutions had problems with placement of well clusters on the surface and well profiles drilling. The introduction of a conceptual approach in the design of the field allows you to accurately determine and optimize the cost of construction of wells and construction of oilfield at the design stage.