{"title":"迈向信息化:BIM技术在中国AEC领域推广及在专业实践中的应用的制约因素与策略","authors":"Wang Luli, Zhang Linyi, Zhang Hao","doi":"10.14733/cadconfp.2022.360-366","DOIUrl":null,"url":null,"abstract":"construction firms to get BIM models shows that nearly 80% of firms need to build BIM models by themselves, and only 8.87% models are provided by clients or design firms. The low rate of BIM implement level in design firms is a gigantic waste from the perspective of the project ’ s whole lifecycle.","PeriodicalId":316648,"journal":{"name":"CAD'22 Proceedings","volume":"38 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-06-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Step towards Informatization: Restrictive Factors and Strategies of BIM Technique’s Popularization in China's AEC Field and Its Adoption in Professional Practice\",\"authors\":\"Wang Luli, Zhang Linyi, Zhang Hao\",\"doi\":\"10.14733/cadconfp.2022.360-366\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"construction firms to get BIM models shows that nearly 80% of firms need to build BIM models by themselves, and only 8.87% models are provided by clients or design firms. The low rate of BIM implement level in design firms is a gigantic waste from the perspective of the project ’ s whole lifecycle.\",\"PeriodicalId\":316648,\"journal\":{\"name\":\"CAD'22 Proceedings\",\"volume\":\"38 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-06-08\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"CAD'22 Proceedings\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.14733/cadconfp.2022.360-366\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"CAD'22 Proceedings","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.14733/cadconfp.2022.360-366","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Step towards Informatization: Restrictive Factors and Strategies of BIM Technique’s Popularization in China's AEC Field and Its Adoption in Professional Practice
construction firms to get BIM models shows that nearly 80% of firms need to build BIM models by themselves, and only 8.87% models are provided by clients or design firms. The low rate of BIM implement level in design firms is a gigantic waste from the perspective of the project ’ s whole lifecycle.