从电力系统总发电成本的角度对独立发电商进行经济评价

T. Kato, H. Horibe, N. Hayakawa, Y. Suzuoki, Y. Kaya
{"title":"从电力系统总发电成本的角度对独立发电商进行经济评价","authors":"T. Kato, H. Horibe, N. Hayakawa, Y. Suzuoki, Y. Kaya","doi":"10.1109/EMPD.1998.705517","DOIUrl":null,"url":null,"abstract":"In Japan, electric power utilities purchase electricity from independent power producers (IPPs) through competitive bidding, where the evaluation of IPP is based on the avoided cost of corresponding generators of utilities. In this evaluation, however, it is difficult to take into account the nonpricing factors such as power flow constraints in the electric power system. In this paper, we evaluated the maximum price to purchase the electricity from IPP on the basis of total generating costs of the electric power utilities, which was referred to as the breakeven cost. The main results are summarized as follows: (1) the breakeven cost depends on various factors such as IPP's generating pattern, location and capacity; (2) the breakeven cost for the base-type IPP is higher than the avoided cost of corresponding utility generator, because an IPP located at the end of the distribution system can reduce the transmission loss in the electric power system; and (3) the capacity of available utility generators affects the breakeven cost especially for the peak-type IPP which generates only during the peak demand period.","PeriodicalId":434526,"journal":{"name":"Proceedings of EMPD '98. 1998 International Conference on Energy Management and Power Delivery (Cat. No.98EX137)","volume":"145 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1998-03-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":"{\"title\":\"Economic evaluation of independent power producers (IPPs) viewed from total generating costs of electric power systems\",\"authors\":\"T. Kato, H. Horibe, N. Hayakawa, Y. Suzuoki, Y. Kaya\",\"doi\":\"10.1109/EMPD.1998.705517\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In Japan, electric power utilities purchase electricity from independent power producers (IPPs) through competitive bidding, where the evaluation of IPP is based on the avoided cost of corresponding generators of utilities. In this evaluation, however, it is difficult to take into account the nonpricing factors such as power flow constraints in the electric power system. In this paper, we evaluated the maximum price to purchase the electricity from IPP on the basis of total generating costs of the electric power utilities, which was referred to as the breakeven cost. The main results are summarized as follows: (1) the breakeven cost depends on various factors such as IPP's generating pattern, location and capacity; (2) the breakeven cost for the base-type IPP is higher than the avoided cost of corresponding utility generator, because an IPP located at the end of the distribution system can reduce the transmission loss in the electric power system; and (3) the capacity of available utility generators affects the breakeven cost especially for the peak-type IPP which generates only during the peak demand period.\",\"PeriodicalId\":434526,\"journal\":{\"name\":\"Proceedings of EMPD '98. 1998 International Conference on Energy Management and Power Delivery (Cat. No.98EX137)\",\"volume\":\"145 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1998-03-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"7\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of EMPD '98. 1998 International Conference on Energy Management and Power Delivery (Cat. No.98EX137)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EMPD.1998.705517\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of EMPD '98. 1998 International Conference on Energy Management and Power Delivery (Cat. No.98EX137)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EMPD.1998.705517","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7

摘要

在日本,电力公司通过竞标的方式向独立电力生产商(IPP)购买电力,其中IPP的评估基于电力公司相应发电机的避免成本。然而,在这种评价中,难以考虑电力系统中潮流约束等非定价因素。本文以电力公司的总发电成本为基础,评估从IPP购买电力的最高价格,称为盈亏平衡成本。研究结果表明:(1)盈亏平衡成本与IPP发电方式、区位、容量等因素有关;(2)基型IPP的盈亏平衡成本高于相应的公用发电机的避免成本,因为在配电系统的末端设置IPP可以降低电力系统中的传输损耗;(3)可用公用事业发电机组的容量影响盈亏平衡成本,特别是仅在需求高峰期间发电的峰型IPP。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Economic evaluation of independent power producers (IPPs) viewed from total generating costs of electric power systems
In Japan, electric power utilities purchase electricity from independent power producers (IPPs) through competitive bidding, where the evaluation of IPP is based on the avoided cost of corresponding generators of utilities. In this evaluation, however, it is difficult to take into account the nonpricing factors such as power flow constraints in the electric power system. In this paper, we evaluated the maximum price to purchase the electricity from IPP on the basis of total generating costs of the electric power utilities, which was referred to as the breakeven cost. The main results are summarized as follows: (1) the breakeven cost depends on various factors such as IPP's generating pattern, location and capacity; (2) the breakeven cost for the base-type IPP is higher than the avoided cost of corresponding utility generator, because an IPP located at the end of the distribution system can reduce the transmission loss in the electric power system; and (3) the capacity of available utility generators affects the breakeven cost especially for the peak-type IPP which generates only during the peak demand period.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信