{"title":"对承包商节约实践中的实施问题","authors":"A. Aistov","doi":"10.31453/kdu.ru.978-5-7913-1194-8-2021-262-266","DOIUrl":null,"url":null,"abstract":"The article examines the concept of contractor's savings in a construction contract, the problems of realizing in practice the contractor's right to demand full payment of the contract price if the cost of actually performed work is less than this price. The author proposes a number of solutions that will allow the contractor to freely exercise the right to pay savings.","PeriodicalId":378551,"journal":{"name":"Научные междисциплинарные исследования. Материалы XV Международной научно-практической конференции: сборник статей, [электронное издание сетевого распространения] / Под ред. Н.В. Емельянова. – М.: “КДУ”, “Добросвет”, 2021. – 464 с.","volume":"9 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"TO THE QUESTION OF IMPLEMENTATION IN THE CONTRACTOR'S SAVING PRACTICE\",\"authors\":\"A. Aistov\",\"doi\":\"10.31453/kdu.ru.978-5-7913-1194-8-2021-262-266\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The article examines the concept of contractor's savings in a construction contract, the problems of realizing in practice the contractor's right to demand full payment of the contract price if the cost of actually performed work is less than this price. The author proposes a number of solutions that will allow the contractor to freely exercise the right to pay savings.\",\"PeriodicalId\":378551,\"journal\":{\"name\":\"Научные междисциплинарные исследования. Материалы XV Международной научно-практической конференции: сборник статей, [электронное издание сетевого распространения] / Под ред. Н.В. Емельянова. – М.: “КДУ”, “Добросвет”, 2021. – 464 с.\",\"volume\":\"9 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Научные междисциплинарные исследования. Материалы XV Международной научно-практической конференции: сборник статей, [электронное издание сетевого распространения] / Под ред. Н.В. Емельянова. – М.: “КДУ”, “Добросвет”, 2021. – 464 с.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.31453/kdu.ru.978-5-7913-1194-8-2021-262-266\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Научные междисциплинарные исследования. Материалы XV Международной научно-практической конференции: сборник статей, [электронное издание сетевого распространения] / Под ред. Н.В. Емельянова. – М.: “КДУ”, “Добросвет”, 2021. – 464 с.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31453/kdu.ru.978-5-7913-1194-8-2021-262-266","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
TO THE QUESTION OF IMPLEMENTATION IN THE CONTRACTOR'S SAVING PRACTICE
The article examines the concept of contractor's savings in a construction contract, the problems of realizing in practice the contractor's right to demand full payment of the contract price if the cost of actually performed work is less than this price. The author proposes a number of solutions that will allow the contractor to freely exercise the right to pay savings.