{"title":"时间驱动的基于作业的成本核算:动机与不确定性","authors":"A. Coners, Gerrit von der Hardt","doi":"10.1007/BF03251401","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":382850,"journal":{"name":"Controlling und Management","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2004-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"13","resultStr":"{\"title\":\"„Time-driven activity-based costing: Motivation und anwendungsperspektiven“\",\"authors\":\"A. Coners, Gerrit von der Hardt\",\"doi\":\"10.1007/BF03251401\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":382850,\"journal\":{\"name\":\"Controlling und Management\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2004-04-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"13\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Controlling und Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1007/BF03251401\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Controlling und Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1007/BF03251401","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}