H. Husniah, U. S. Pasaribu, B. P. Iskandar
{"title":"业主与代理人协调的二维维修合同","authors":"H. Husniah, U. S. Pasaribu, B. P. Iskandar","doi":"10.1109/IEEM.2016.7797929","DOIUrl":null,"url":null,"abstract":"A two dimensional maintenance contracts with coordcination between two parties is studied in this paper. The contract is applied to a dump truck operated in a mining industry. The situation under study is that an agent offers two dimensional service contract to the owner of the truck. The owner's decision to get high availability and the agent's decision to minimize the total maintenance cost are coordinated in order to reach a win-win solution. In addition, we consider the use of incentive contracts to the agent based on a combination of a target uptime level and a bonus. This is done in order to obtain a win-win situation and provides flexibility in allocating the extra profit generated from coordination.","PeriodicalId":114906,"journal":{"name":"2016 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","volume":"199 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Two dimensional maintenance contract with coordination between owner and agent\",\"authors\":\"H. Husniah, U. S. Pasaribu, B. P. Iskandar\",\"doi\":\"10.1109/IEEM.2016.7797929\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A two dimensional maintenance contracts with coordcination between two parties is studied in this paper. The contract is applied to a dump truck operated in a mining industry. The situation under study is that an agent offers two dimensional service contract to the owner of the truck. The owner's decision to get high availability and the agent's decision to minimize the total maintenance cost are coordinated in order to reach a win-win solution. In addition, we consider the use of incentive contracts to the agent based on a combination of a target uptime level and a bonus. This is done in order to obtain a win-win situation and provides flexibility in allocating the extra profit generated from coordination.\",\"PeriodicalId\":114906,\"journal\":{\"name\":\"2016 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)\",\"volume\":\"199 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2016 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IEEM.2016.7797929\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEEM.2016.7797929","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

研究了一种具有协调关系的二维维修合同。该合同适用于采矿业经营的自卸卡车。本文研究的情况是,一个代理向卡车的所有者提供二维的服务合同。业主获得高可用性的决策和代理最小化总维护成本的决策是协调一致的,以达到双赢的解决方案。此外,我们考虑基于目标正常运行时间水平和奖金的组合对代理使用激励合同。这样做是为了获得双赢的局面,并为分配协调产生的额外利润提供灵活性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Two dimensional maintenance contract with coordination between owner and agent
A two dimensional maintenance contracts with coordcination between two parties is studied in this paper. The contract is applied to a dump truck operated in a mining industry. The situation under study is that an agent offers two dimensional service contract to the owner of the truck. The owner's decision to get high availability and the agent's decision to minimize the total maintenance cost are coordinated in order to reach a win-win solution. In addition, we consider the use of incentive contracts to the agent based on a combination of a target uptime level and a bonus. This is done in order to obtain a win-win situation and provides flexibility in allocating the extra profit generated from coordination.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信