{"title":"输电系统的可靠性和经济性评估i:使用故障频率和持续时间法","authors":"A. Shaban, A. Go","doi":"10.1109/SSST.1993.522749","DOIUrl":null,"url":null,"abstract":"The reliability of a transmission system model consisting of transmission lines, transformers, and circuit breakers is calculated from sample data using the frequency and duration method. The model is modified by adding another transmission line and a transformer to study the effect on reliability. A significant decrease in system down time is found when a transformer is added in parallel with the two existing ones, whereas adding another transmission line produces only a minimal decrease. A study has been conducted to determine whether it is economically feasible to add another transformer to increase the model system's reliability and decrease its down time. During a twenty-year period, it was found that the savings of energy, and the dollars associated with it, exceeds the costs of the additional transformer.","PeriodicalId":260036,"journal":{"name":"1993 (25th) Southeastern Symposium on System Theory","volume":"9 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1993-03-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"A reliability and economic evaluation of a transmission system-I: Using frequency and duration of failure method\",\"authors\":\"A. Shaban, A. Go\",\"doi\":\"10.1109/SSST.1993.522749\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The reliability of a transmission system model consisting of transmission lines, transformers, and circuit breakers is calculated from sample data using the frequency and duration method. The model is modified by adding another transmission line and a transformer to study the effect on reliability. A significant decrease in system down time is found when a transformer is added in parallel with the two existing ones, whereas adding another transmission line produces only a minimal decrease. A study has been conducted to determine whether it is economically feasible to add another transformer to increase the model system's reliability and decrease its down time. During a twenty-year period, it was found that the savings of energy, and the dollars associated with it, exceeds the costs of the additional transformer.\",\"PeriodicalId\":260036,\"journal\":{\"name\":\"1993 (25th) Southeastern Symposium on System Theory\",\"volume\":\"9 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1993-03-07\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"1993 (25th) Southeastern Symposium on System Theory\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/SSST.1993.522749\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"1993 (25th) Southeastern Symposium on System Theory","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SSST.1993.522749","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
A reliability and economic evaluation of a transmission system-I: Using frequency and duration of failure method
The reliability of a transmission system model consisting of transmission lines, transformers, and circuit breakers is calculated from sample data using the frequency and duration method. The model is modified by adding another transmission line and a transformer to study the effect on reliability. A significant decrease in system down time is found when a transformer is added in parallel with the two existing ones, whereas adding another transmission line produces only a minimal decrease. A study has been conducted to determine whether it is economically feasible to add another transformer to increase the model system's reliability and decrease its down time. During a twenty-year period, it was found that the savings of energy, and the dollars associated with it, exceeds the costs of the additional transformer.