{"title":"风电系统谐波失真计算中的建模不确定性","authors":"A. Romero, C. Samudio, H. Zini, G. Rattá","doi":"10.1109/SIFAE.2012.6478904","DOIUrl":null,"url":null,"abstract":"This article presents and develops main aspects to be considered when harmonics have to be modeled in a power system including wind farms in its generator fleet. In particular, uncertainty involved in the analysis, because the wind speed variations, is considered and included in a more complete methodology, that is capable to compute the possibility distributions of the harmonic voltage distortion at all buses of the power system. Such a methodology, developed by the authors, is the possibilistic harmonic load-flow. Simulations to test the proposal are developed in the IEEE 14-bus standard test system for harmonic analysis, but replacing the generator at bus two, with a wind farm.","PeriodicalId":330140,"journal":{"name":"2012 IEEE International Symposium on Alternative Energies and Energy Quality (SIFAE)","volume":"12 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Modeling uncertainties in the harmonic distortion calculation in power systems, due to wind farms\",\"authors\":\"A. Romero, C. Samudio, H. Zini, G. Rattá\",\"doi\":\"10.1109/SIFAE.2012.6478904\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This article presents and develops main aspects to be considered when harmonics have to be modeled in a power system including wind farms in its generator fleet. In particular, uncertainty involved in the analysis, because the wind speed variations, is considered and included in a more complete methodology, that is capable to compute the possibility distributions of the harmonic voltage distortion at all buses of the power system. Such a methodology, developed by the authors, is the possibilistic harmonic load-flow. Simulations to test the proposal are developed in the IEEE 14-bus standard test system for harmonic analysis, but replacing the generator at bus two, with a wind farm.\",\"PeriodicalId\":330140,\"journal\":{\"name\":\"2012 IEEE International Symposium on Alternative Energies and Energy Quality (SIFAE)\",\"volume\":\"12 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2012-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2012 IEEE International Symposium on Alternative Energies and Energy Quality (SIFAE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/SIFAE.2012.6478904\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 IEEE International Symposium on Alternative Energies and Energy Quality (SIFAE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SIFAE.2012.6478904","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Modeling uncertainties in the harmonic distortion calculation in power systems, due to wind farms
This article presents and develops main aspects to be considered when harmonics have to be modeled in a power system including wind farms in its generator fleet. In particular, uncertainty involved in the analysis, because the wind speed variations, is considered and included in a more complete methodology, that is capable to compute the possibility distributions of the harmonic voltage distortion at all buses of the power system. Such a methodology, developed by the authors, is the possibilistic harmonic load-flow. Simulations to test the proposal are developed in the IEEE 14-bus standard test system for harmonic analysis, but replacing the generator at bus two, with a wind farm.