灾难准备:利用预计算在故障时有效修复图结构

Calvin C. Newport, N. Vaidya, A. Weaver
{"title":"灾难准备:利用预计算在故障时有效修复图结构","authors":"Calvin C. Newport, N. Vaidya, A. Weaver","doi":"10.1145/3490148.3538564","DOIUrl":null,"url":null,"abstract":"Distributed algorithms for constructing structures such as a maximal independent set (MIS) or maximal matching (MM) are well-studied in standard message-passing network models. In this paper, we consider a natural variant of this problem in which we begin with an instance of the graph structure and partition our algorithm execution that follows into two stages. During the first stage after the graph structure is calculated, some additional precomputation is done. In the second stage, an arbitrary collection of k nodes are crashed. The goal is to then repair the structure as efficiently as possible. We are interested in the circumstances under which the repair can be faster than the time required to build the structure from scratch, and focus, in particular, on trade-offs in which extra precomputation rounds during the first stage can be traded for faster repairs during the second.","PeriodicalId":112865,"journal":{"name":"Proceedings of the 34th ACM Symposium on Parallelism in Algorithms and Architectures","volume":"43 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-07-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Preparing for Disaster: Leveraging Precomputation to Efficiently Repair Graph Structures Upon Failures\",\"authors\":\"Calvin C. Newport, N. Vaidya, A. Weaver\",\"doi\":\"10.1145/3490148.3538564\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Distributed algorithms for constructing structures such as a maximal independent set (MIS) or maximal matching (MM) are well-studied in standard message-passing network models. In this paper, we consider a natural variant of this problem in which we begin with an instance of the graph structure and partition our algorithm execution that follows into two stages. During the first stage after the graph structure is calculated, some additional precomputation is done. In the second stage, an arbitrary collection of k nodes are crashed. The goal is to then repair the structure as efficiently as possible. We are interested in the circumstances under which the repair can be faster than the time required to build the structure from scratch, and focus, in particular, on trade-offs in which extra precomputation rounds during the first stage can be traded for faster repairs during the second.\",\"PeriodicalId\":112865,\"journal\":{\"name\":\"Proceedings of the 34th ACM Symposium on Parallelism in Algorithms and Architectures\",\"volume\":\"43 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-07-11\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the 34th ACM Symposium on Parallelism in Algorithms and Architectures\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1145/3490148.3538564\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 34th ACM Symposium on Parallelism in Algorithms and Architectures","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/3490148.3538564","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

用于构造诸如最大独立集(MIS)或最大匹配(MM)等结构的分布式算法在标准消息传递网络模型中得到了很好的研究。在本文中,我们考虑了这个问题的一个自然变体,其中我们从图结构的一个实例开始,并将我们的算法执行分为两个阶段。在图结构计算完成后的第一阶段,进行一些额外的预计算。在第二阶段,k个节点的任意集合崩溃。我们的目标是尽可能高效地修复结构。我们感兴趣的是,在这种情况下,修复可以比从头开始构建结构所需的时间更快,并特别关注在第一阶段额外的预计算轮可以在第二阶段以更快的修复进行交换的权衡。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Preparing for Disaster: Leveraging Precomputation to Efficiently Repair Graph Structures Upon Failures
Distributed algorithms for constructing structures such as a maximal independent set (MIS) or maximal matching (MM) are well-studied in standard message-passing network models. In this paper, we consider a natural variant of this problem in which we begin with an instance of the graph structure and partition our algorithm execution that follows into two stages. During the first stage after the graph structure is calculated, some additional precomputation is done. In the second stage, an arbitrary collection of k nodes are crashed. The goal is to then repair the structure as efficiently as possible. We are interested in the circumstances under which the repair can be faster than the time required to build the structure from scratch, and focus, in particular, on trade-offs in which extra precomputation rounds during the first stage can be traded for faster repairs during the second.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信