{"title":"Ti/dseg集成产品开发流程","authors":"T. Moody","doi":"10.1109/CAREER.1994.643418","DOIUrl":null,"url":null,"abstract":"This 2-day workshop has saved my program 6 weeks of planning time!\" This comment came from a program manager after attending a tailoring session for his program. They had just finished making the TI/DSEG IPD Process fit their program. Comments like this are common from programs that understand and use the process. ONCURRENT Engineering IS the design practice C of the future. The Integrated Product Development Process is our way of ingraining the concept into the culture of TI/DSEG. Our process describes the DoD procurement cycle by listing the tasks we must accomplish in each of the phases. Those phases are Concept Explo- ration (CE), Demonstration/Validation (Dem/Val>, Engineering and Manufacturing Development (EMD), Production, and Operation/Support. This IPD process contains more than 100 flowcharts, detailing over 900 tasks in the life cycle of the nominal DoD program. We have a commercial version as well.","PeriodicalId":306557,"journal":{"name":"Eighth Biennial IEEE-USA Careers Conference,","volume":"44 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1994-04-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Integrated Product Development Process at Ti/dseg\",\"authors\":\"T. Moody\",\"doi\":\"10.1109/CAREER.1994.643418\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This 2-day workshop has saved my program 6 weeks of planning time!\\\" This comment came from a program manager after attending a tailoring session for his program. They had just finished making the TI/DSEG IPD Process fit their program. Comments like this are common from programs that understand and use the process. ONCURRENT Engineering IS the design practice C of the future. The Integrated Product Development Process is our way of ingraining the concept into the culture of TI/DSEG. Our process describes the DoD procurement cycle by listing the tasks we must accomplish in each of the phases. Those phases are Concept Explo- ration (CE), Demonstration/Validation (Dem/Val>, Engineering and Manufacturing Development (EMD), Production, and Operation/Support. This IPD process contains more than 100 flowcharts, detailing over 900 tasks in the life cycle of the nominal DoD program. We have a commercial version as well.\",\"PeriodicalId\":306557,\"journal\":{\"name\":\"Eighth Biennial IEEE-USA Careers Conference,\",\"volume\":\"44 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1994-04-14\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Eighth Biennial IEEE-USA Careers Conference,\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CAREER.1994.643418\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Eighth Biennial IEEE-USA Careers Conference,","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CAREER.1994.643418","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

这个为期两天的研讨会为我节省了6周的计划时间!”这个评论来自一位项目经理,他参加了一个为他的项目量身定制的会议之后。他们刚刚完成了TI/DSEG IPD过程适合他们的计划。这样的注释在理解并使用该过程的程序中很常见。当代工程是未来的设计实践。集成产品开发流程是我们将概念植入TI/DSEG文化的方式。我们的流程通过列出我们在每个阶段必须完成的任务来描述国防部采购周期。这些阶段是概念探索(CE)、演示/验证(Dem/Val)、工程和制造开发(EMD)、生产和运营/支持。该IPD过程包含100多个流程图,详细说明了名义DoD计划生命周期中的900多个任务。我们也有一个商业版本。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Integrated Product Development Process at Ti/dseg
This 2-day workshop has saved my program 6 weeks of planning time!" This comment came from a program manager after attending a tailoring session for his program. They had just finished making the TI/DSEG IPD Process fit their program. Comments like this are common from programs that understand and use the process. ONCURRENT Engineering IS the design practice C of the future. The Integrated Product Development Process is our way of ingraining the concept into the culture of TI/DSEG. Our process describes the DoD procurement cycle by listing the tasks we must accomplish in each of the phases. Those phases are Concept Explo- ration (CE), Demonstration/Validation (Dem/Val>, Engineering and Manufacturing Development (EMD), Production, and Operation/Support. This IPD process contains more than 100 flowcharts, detailing over 900 tasks in the life cycle of the nominal DoD program. We have a commercial version as well.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信