{"title":"Ti/dseg集成产品开发流程","authors":"T. Moody","doi":"10.1109/CAREER.1994.643418","DOIUrl":null,"url":null,"abstract":"This 2-day workshop has saved my program 6 weeks of planning time!\" This comment came from a program manager after attending a tailoring session for his program. They had just finished making the TI/DSEG IPD Process fit their program. Comments like this are common from programs that understand and use the process. ONCURRENT Engineering IS the design practice C of the future. The Integrated Product Development Process is our way of ingraining the concept into the culture of TI/DSEG. Our process describes the DoD procurement cycle by listing the tasks we must accomplish in each of the phases. Those phases are Concept Explo- ration (CE), Demonstration/Validation (Dem/Val>, Engineering and Manufacturing Development (EMD), Production, and Operation/Support. This IPD process contains more than 100 flowcharts, detailing over 900 tasks in the life cycle of the nominal DoD program. We have a commercial version as well.","PeriodicalId":306557,"journal":{"name":"Eighth Biennial IEEE-USA Careers Conference,","volume":"44 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1994-04-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Integrated Product Development Process at Ti/dseg\",\"authors\":\"T. Moody\",\"doi\":\"10.1109/CAREER.1994.643418\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This 2-day workshop has saved my program 6 weeks of planning time!\\\" This comment came from a program manager after attending a tailoring session for his program. They had just finished making the TI/DSEG IPD Process fit their program. Comments like this are common from programs that understand and use the process. ONCURRENT Engineering IS the design practice C of the future. The Integrated Product Development Process is our way of ingraining the concept into the culture of TI/DSEG. Our process describes the DoD procurement cycle by listing the tasks we must accomplish in each of the phases. Those phases are Concept Explo- ration (CE), Demonstration/Validation (Dem/Val>, Engineering and Manufacturing Development (EMD), Production, and Operation/Support. This IPD process contains more than 100 flowcharts, detailing over 900 tasks in the life cycle of the nominal DoD program. We have a commercial version as well.\",\"PeriodicalId\":306557,\"journal\":{\"name\":\"Eighth Biennial IEEE-USA Careers Conference,\",\"volume\":\"44 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1994-04-14\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Eighth Biennial IEEE-USA Careers Conference,\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CAREER.1994.643418\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Eighth Biennial IEEE-USA Careers Conference,","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CAREER.1994.643418","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
This 2-day workshop has saved my program 6 weeks of planning time!" This comment came from a program manager after attending a tailoring session for his program. They had just finished making the TI/DSEG IPD Process fit their program. Comments like this are common from programs that understand and use the process. ONCURRENT Engineering IS the design practice C of the future. The Integrated Product Development Process is our way of ingraining the concept into the culture of TI/DSEG. Our process describes the DoD procurement cycle by listing the tasks we must accomplish in each of the phases. Those phases are Concept Explo- ration (CE), Demonstration/Validation (Dem/Val>, Engineering and Manufacturing Development (EMD), Production, and Operation/Support. This IPD process contains more than 100 flowcharts, detailing over 900 tasks in the life cycle of the nominal DoD program. We have a commercial version as well.