约旦建设项目变更订单的原因及影响调查

Mohammed A.KA. Al-Btoush
{"title":"约旦建设项目变更订单的原因及影响调查","authors":"Mohammed A.KA. Al-Btoush","doi":"10.32441/jaset.04.01.07","DOIUrl":null,"url":null,"abstract":"The construction industry nowadays faces several challenges that prevent it to be completed within the planned budget. the most effected challenge on the project cost is the variation orders, which became common on most construction projects. The variations in construction projects mean any change in quantity or quality of the project work. Based on various studies in the Jordanian construction industry it is found various sources of variation orders. Therefore, it is important to provide suitable recommendations to minimize variation orders during the project lifecycle. The aim of this study is to study the variation orders causes on the governmental construction project in Jordan. To meet that aim, a comprehensive literature review was conducted to locate and study the variation orders causes and its effect on construction projects worldwide. To achieve the study objectively the researcher adopted a structured questionnaire to gather the required data about the causes of VO. The collected data were analyzed statistically using the Relative Importance Index (RII). Based on the results of the study the critical causes of VO in construction projects in Jordan are grouped into main four groups such as causes related to owners, causes related to contractors, and causes related to consultants, causes related to unforeseen circumstances. The findings of the current study revealed that the critical causes of VO in the Jordanian construction industry are: unskilled laborers, inaccurate quantity take-off, shortage of human and equipment Resource, change of scope or plans by owners, absence of construction manuals and procedures , unavailability of the required labor skills , logistic delays , shortage of equipment and tools , technology changes , internal politics .Also, the results show that consultants are responsible for about 50% of the causes, 20% due to owners and unforeseen variations, and contractors are responsible for about 10% of the causes.","PeriodicalId":431188,"journal":{"name":"Journal of Advanced Sciences and Engineering Technologies","volume":"76 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-10-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"INVESTIGATION ON THE CAUSES AND EFFECTS OF VARIATION ORDERS IN THE CONSTRUCTION PROJECTS IN JORDAN\",\"authors\":\"Mohammed A.KA. Al-Btoush\",\"doi\":\"10.32441/jaset.04.01.07\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The construction industry nowadays faces several challenges that prevent it to be completed within the planned budget. the most effected challenge on the project cost is the variation orders, which became common on most construction projects. The variations in construction projects mean any change in quantity or quality of the project work. Based on various studies in the Jordanian construction industry it is found various sources of variation orders. Therefore, it is important to provide suitable recommendations to minimize variation orders during the project lifecycle. The aim of this study is to study the variation orders causes on the governmental construction project in Jordan. To meet that aim, a comprehensive literature review was conducted to locate and study the variation orders causes and its effect on construction projects worldwide. To achieve the study objectively the researcher adopted a structured questionnaire to gather the required data about the causes of VO. The collected data were analyzed statistically using the Relative Importance Index (RII). Based on the results of the study the critical causes of VO in construction projects in Jordan are grouped into main four groups such as causes related to owners, causes related to contractors, and causes related to consultants, causes related to unforeseen circumstances. The findings of the current study revealed that the critical causes of VO in the Jordanian construction industry are: unskilled laborers, inaccurate quantity take-off, shortage of human and equipment Resource, change of scope or plans by owners, absence of construction manuals and procedures , unavailability of the required labor skills , logistic delays , shortage of equipment and tools , technology changes , internal politics .Also, the results show that consultants are responsible for about 50% of the causes, 20% due to owners and unforeseen variations, and contractors are responsible for about 10% of the causes.\",\"PeriodicalId\":431188,\"journal\":{\"name\":\"Journal of Advanced Sciences and Engineering Technologies\",\"volume\":\"76 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-10-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Advanced Sciences and Engineering Technologies\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.32441/jaset.04.01.07\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Advanced Sciences and Engineering Technologies","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.32441/jaset.04.01.07","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

建筑行业目前面临着一些挑战,阻止它在计划预算内完成。对工程造价影响最大的挑战是变更顺序,这在大多数建设项目中都很常见。建设项目的变更是指工程数量和质量的变化。根据对约旦建筑业的各种研究,发现了各种变化订单的来源。因此,在项目生命周期中提供合适的建议以最小化变更顺序是很重要的。本研究的目的是研究约旦政府建设项目变更顺序的成因。为了达到这一目的,本文进行了全面的文献综述,以定位和研究世界范围内的工程项目的变化顺序的原因及其影响。为了客观地完成研究,研究者采用了结构化的问卷来收集VO成因所需的数据。采用相对重要性指数(Relative Importance Index, RII)对收集到的数据进行统计分析。根据研究结果,约旦建筑项目中VO的关键原因分为四大类,如与业主有关的原因,与承包商有关的原因,与顾问有关的原因,与不可预见的情况有关的原因。目前的研究结果表明,约旦建筑行业VO的主要原因是:不熟练的工人,数量不准确,人力和设备资源短缺,业主改变范围或计划,缺乏施工手册和程序,无法获得所需的劳动技能,物流延误,设备和工具短缺,技术变革,内部政治。此外,结果表明,顾问负责约50%的原因,20%归因于业主和不可预见的变化。承包商要为大约10%的原因负责。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
INVESTIGATION ON THE CAUSES AND EFFECTS OF VARIATION ORDERS IN THE CONSTRUCTION PROJECTS IN JORDAN
The construction industry nowadays faces several challenges that prevent it to be completed within the planned budget. the most effected challenge on the project cost is the variation orders, which became common on most construction projects. The variations in construction projects mean any change in quantity or quality of the project work. Based on various studies in the Jordanian construction industry it is found various sources of variation orders. Therefore, it is important to provide suitable recommendations to minimize variation orders during the project lifecycle. The aim of this study is to study the variation orders causes on the governmental construction project in Jordan. To meet that aim, a comprehensive literature review was conducted to locate and study the variation orders causes and its effect on construction projects worldwide. To achieve the study objectively the researcher adopted a structured questionnaire to gather the required data about the causes of VO. The collected data were analyzed statistically using the Relative Importance Index (RII). Based on the results of the study the critical causes of VO in construction projects in Jordan are grouped into main four groups such as causes related to owners, causes related to contractors, and causes related to consultants, causes related to unforeseen circumstances. The findings of the current study revealed that the critical causes of VO in the Jordanian construction industry are: unskilled laborers, inaccurate quantity take-off, shortage of human and equipment Resource, change of scope or plans by owners, absence of construction manuals and procedures , unavailability of the required labor skills , logistic delays , shortage of equipment and tools , technology changes , internal politics .Also, the results show that consultants are responsible for about 50% of the causes, 20% due to owners and unforeseen variations, and contractors are responsible for about 10% of the causes.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信