哥斯达黎加大学学生协作时数管理系统的评估:一个案例研究

Jose Daniel Sanchez Castillo, Marcelo Jenkins
{"title":"哥斯达黎加大学学生协作时数管理系统的评估:一个案例研究","authors":"Jose Daniel Sanchez Castillo, Marcelo Jenkins","doi":"10.1109/jocici54528.2021.9794343","DOIUrl":null,"url":null,"abstract":"Software estimation is a tool that seeks to provide organizations with a means to know the risks, costs and benefits that software development implies. The goal of this study is to estimate the effort required for a student collaboration hours management system in the context of the University of Costa Rica. For this, the IFPUG function point count standard and estimation models such as COCOMO II, the regression technique, the analogy technique and the comparison technique were used. The results show that the COCOMO II estimation method has the highest values of effort and duration and the analog technique the lowest values. For the regression and comparison techniques, the values were similar, located between the values obtained with COCOMO II and analogy, therefore, it was considered as a good estimation option for the system.","PeriodicalId":339143,"journal":{"name":"2021 IEEE V Jornadas Costarricenses de Investigación en Computación e Informática (JoCICI)","volume":"32 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-10-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Estimation for a student collaboration hours management system at the University of Costa Rica: a case study\",\"authors\":\"Jose Daniel Sanchez Castillo, Marcelo Jenkins\",\"doi\":\"10.1109/jocici54528.2021.9794343\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Software estimation is a tool that seeks to provide organizations with a means to know the risks, costs and benefits that software development implies. The goal of this study is to estimate the effort required for a student collaboration hours management system in the context of the University of Costa Rica. For this, the IFPUG function point count standard and estimation models such as COCOMO II, the regression technique, the analogy technique and the comparison technique were used. The results show that the COCOMO II estimation method has the highest values of effort and duration and the analog technique the lowest values. For the regression and comparison techniques, the values were similar, located between the values obtained with COCOMO II and analogy, therefore, it was considered as a good estimation option for the system.\",\"PeriodicalId\":339143,\"journal\":{\"name\":\"2021 IEEE V Jornadas Costarricenses de Investigación en Computación e Informática (JoCICI)\",\"volume\":\"32 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-10-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2021 IEEE V Jornadas Costarricenses de Investigación en Computación e Informática (JoCICI)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/jocici54528.2021.9794343\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 IEEE V Jornadas Costarricenses de Investigación en Computación e Informática (JoCICI)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/jocici54528.2021.9794343","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

软件评估是一种工具,旨在为组织提供一种方法来了解软件开发所隐含的风险、成本和收益。本研究的目的是估计哥斯达黎加大学背景下学生协作时间管理系统所需的努力。为此,使用了IFPUG功能点计数标准和COCOMO II等估计模型、回归技术、类比技术和比较技术。结果表明,COCOMO II估计方法的努力和持续时间值最高,模拟方法的努力和持续时间值最低。对于回归和比较技术,其值相似,位于COCOMO II和类比得到的值之间,因此被认为是系统较好的估计选项。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Estimation for a student collaboration hours management system at the University of Costa Rica: a case study
Software estimation is a tool that seeks to provide organizations with a means to know the risks, costs and benefits that software development implies. The goal of this study is to estimate the effort required for a student collaboration hours management system in the context of the University of Costa Rica. For this, the IFPUG function point count standard and estimation models such as COCOMO II, the regression technique, the analogy technique and the comparison technique were used. The results show that the COCOMO II estimation method has the highest values of effort and duration and the analog technique the lowest values. For the regression and comparison techniques, the values were similar, located between the values obtained with COCOMO II and analogy, therefore, it was considered as a good estimation option for the system.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信