电厂脱硝系统自动供氨阀调试与控制研究

Zhu Yujie, Shen Jianjun, Tu Anqi, Z. Zhiyong
{"title":"电厂脱硝系统自动供氨阀调试与控制研究","authors":"Zhu Yujie, Shen Jianjun, Tu Anqi, Z. Zhiyong","doi":"10.1109/ICPRE48497.2019.9034698","DOIUrl":null,"url":null,"abstract":"Since 2015, China has strengthened the control of NOx emissions, and put forward higher requirements for the denitrification efficiency of the original SCR. In the SCR denitration system of coal-fired power plants, the problems of high ammonia escape rate are common. The traditional automatic control system must be optimized to solve these problems. Automatic controlling for ammonia gas supply valve of denigration system is also one of the common problems during debugging. Mismanagement will bring excess ammonia spray, equipment operating safety hazard and the increase in the operating personnel workload easily. This paper describes the debugging process of ammonia gas supply valve. The suggestions for improvement is proposed to adjust the valve control strategies and reduce dead-zone valves.","PeriodicalId":387293,"journal":{"name":"2019 4th International Conference on Power and Renewable Energy (ICPRE)","volume":"27 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Research on Debugging and Controlling for Automatic Ammonia Gas Supply Valve of Power Plant Denitration System\",\"authors\":\"Zhu Yujie, Shen Jianjun, Tu Anqi, Z. Zhiyong\",\"doi\":\"10.1109/ICPRE48497.2019.9034698\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Since 2015, China has strengthened the control of NOx emissions, and put forward higher requirements for the denitrification efficiency of the original SCR. In the SCR denitration system of coal-fired power plants, the problems of high ammonia escape rate are common. The traditional automatic control system must be optimized to solve these problems. Automatic controlling for ammonia gas supply valve of denigration system is also one of the common problems during debugging. Mismanagement will bring excess ammonia spray, equipment operating safety hazard and the increase in the operating personnel workload easily. This paper describes the debugging process of ammonia gas supply valve. The suggestions for improvement is proposed to adjust the valve control strategies and reduce dead-zone valves.\",\"PeriodicalId\":387293,\"journal\":{\"name\":\"2019 4th International Conference on Power and Renewable Energy (ICPRE)\",\"volume\":\"27 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2019 4th International Conference on Power and Renewable Energy (ICPRE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICPRE48497.2019.9034698\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 4th International Conference on Power and Renewable Energy (ICPRE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICPRE48497.2019.9034698","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

2015年以来,中国加强了对NOx排放的控制,对原SCR的脱硝效率提出了更高的要求。在燃煤电厂SCR脱硝系统中,氨逸率高的问题十分普遍。为了解决这些问题,必须对传统的自动控制系统进行优化。脱硝系统供氨阀的自动控制也是调试过程中常见的问题之一。管理不善容易造成氨喷过量,设备运行安全隐患和操作人员工作量的增加。本文介绍了氨供气阀的调试过程。提出了调整阀门控制策略、减少死区阀的改进建议。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Research on Debugging and Controlling for Automatic Ammonia Gas Supply Valve of Power Plant Denitration System
Since 2015, China has strengthened the control of NOx emissions, and put forward higher requirements for the denitrification efficiency of the original SCR. In the SCR denitration system of coal-fired power plants, the problems of high ammonia escape rate are common. The traditional automatic control system must be optimized to solve these problems. Automatic controlling for ammonia gas supply valve of denigration system is also one of the common problems during debugging. Mismanagement will bring excess ammonia spray, equipment operating safety hazard and the increase in the operating personnel workload easily. This paper describes the debugging process of ammonia gas supply valve. The suggestions for improvement is proposed to adjust the valve control strategies and reduce dead-zone valves.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信