测定时间敏感操作中产品释放量的方法

J. Levy, R. Burda, T. Stahlecker
{"title":"测定时间敏感操作中产品释放量的方法","authors":"J. Levy, R. Burda, T. Stahlecker","doi":"10.1109/WSC.2010.5678948","DOIUrl":null,"url":null,"abstract":"In manufacturing environments, there are potential requirements for a manufacturing step to be performed within a specific amount of time; failure to do so could result in product being defective or scrapped. This paper will show how a simulation model was used to define which factors are of utmost importance when determining the amount of product that can be released into one of these time sensitive steps.","PeriodicalId":272260,"journal":{"name":"Proceedings of the 2010 Winter Simulation Conference","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-12-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Method for determining amount of product released into a time sensitive operation\",\"authors\":\"J. Levy, R. Burda, T. Stahlecker\",\"doi\":\"10.1109/WSC.2010.5678948\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In manufacturing environments, there are potential requirements for a manufacturing step to be performed within a specific amount of time; failure to do so could result in product being defective or scrapped. This paper will show how a simulation model was used to define which factors are of utmost importance when determining the amount of product that can be released into one of these time sensitive steps.\",\"PeriodicalId\":272260,\"journal\":{\"name\":\"Proceedings of the 2010 Winter Simulation Conference\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-12-05\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the 2010 Winter Simulation Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/WSC.2010.5678948\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 2010 Winter Simulation Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/WSC.2010.5678948","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

在制造环境中,有可能要求在特定时间内执行制造步骤;如果不这样做,可能会导致产品有缺陷或报废。本文将展示如何使用模拟模型来定义在确定可以释放到这些时间敏感步骤之一的产品数量时哪些因素是最重要的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Method for determining amount of product released into a time sensitive operation
In manufacturing environments, there are potential requirements for a manufacturing step to be performed within a specific amount of time; failure to do so could result in product being defective or scrapped. This paper will show how a simulation model was used to define which factors are of utmost importance when determining the amount of product that can be released into one of these time sensitive steps.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信