政府主导的农村基础设施PPP项目风险分配

Xia Xiao, Hui Ao
{"title":"政府主导的农村基础设施PPP项目风险分配","authors":"Xia Xiao, Hui Ao","doi":"10.2991/ISMSS-19.2019.38","DOIUrl":null,"url":null,"abstract":"The rural infrastructure PPP project can alleviate the government's financial pressure on rural infrastructure construction to a certain extent, and the reasonable allocation of PPP project risks is a key for the progress of the PPP project. This paper based on the principle of government priority bidding, uses the bargaining game theory to establish a bargaining model for risk allocation of PPP projects under incomplete information, and calculates the risk allocation ratio between government and private sector by calculating the Nash equilibrium. Finally, the beautiful villages PPP project in the Shangyu district is taken as an example to provide a reasonable plan for determining the proportion of risk allocation. Keywords—Rural infrastructure; PPP project; risk allocation; government sector; private sector","PeriodicalId":334270,"journal":{"name":"Proceedings of The First International Symposium on Management and Social Sciences (ISMSS 2019)","volume":"13 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Government-led rural Infrastructure PPP Project Risk Allocation\",\"authors\":\"Xia Xiao, Hui Ao\",\"doi\":\"10.2991/ISMSS-19.2019.38\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The rural infrastructure PPP project can alleviate the government's financial pressure on rural infrastructure construction to a certain extent, and the reasonable allocation of PPP project risks is a key for the progress of the PPP project. This paper based on the principle of government priority bidding, uses the bargaining game theory to establish a bargaining model for risk allocation of PPP projects under incomplete information, and calculates the risk allocation ratio between government and private sector by calculating the Nash equilibrium. Finally, the beautiful villages PPP project in the Shangyu district is taken as an example to provide a reasonable plan for determining the proportion of risk allocation. Keywords—Rural infrastructure; PPP project; risk allocation; government sector; private sector\",\"PeriodicalId\":334270,\"journal\":{\"name\":\"Proceedings of The First International Symposium on Management and Social Sciences (ISMSS 2019)\",\"volume\":\"13 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-04-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of The First International Symposium on Management and Social Sciences (ISMSS 2019)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2991/ISMSS-19.2019.38\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of The First International Symposium on Management and Social Sciences (ISMSS 2019)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2991/ISMSS-19.2019.38","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

农村基础设施PPP项目可以在一定程度上缓解政府对农村基础设施建设的资金压力,而PPP项目风险的合理分配是PPP项目能否顺利推进的关键。本文基于政府优先招标原则,运用议价博弈论建立了不完全信息下PPP项目风险分配的议价模型,并通过计算纳什均衡计算政府与私营部门之间的风险分配比。最后以上虞区美丽乡村PPP项目为例,为确定风险分担比例提供合理方案。Keywords-Rural基础设施;PPP项目;风险分配;政府部门;私营部门
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Government-led rural Infrastructure PPP Project Risk Allocation
The rural infrastructure PPP project can alleviate the government's financial pressure on rural infrastructure construction to a certain extent, and the reasonable allocation of PPP project risks is a key for the progress of the PPP project. This paper based on the principle of government priority bidding, uses the bargaining game theory to establish a bargaining model for risk allocation of PPP projects under incomplete information, and calculates the risk allocation ratio between government and private sector by calculating the Nash equilibrium. Finally, the beautiful villages PPP project in the Shangyu district is taken as an example to provide a reasonable plan for determining the proportion of risk allocation. Keywords—Rural infrastructure; PPP project; risk allocation; government sector; private sector
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信