最小化流程时间的并行机器调度:飞机公司X车削和铣削部门的案例研究

Asep Anwar, Didit Damur Rochman
{"title":"最小化流程时间的并行机器调度:飞机公司X车削和铣削部门的案例研究","authors":"Asep Anwar, Didit Damur Rochman","doi":"10.13189/UJME.2019.071306","DOIUrl":null,"url":null,"abstract":"Company X in 2017 has a delay in the Turning and Milling department of 58% of the total order of 2,334. The actual condition is the number of machines used, namely 5 CNC machines with a production capacity of 230.4 hours / week and the number of work orders from 2013-2018 that must be done is 2767,458 hours. The delay was due to the absence of an appropriate engine scheduling system. Modeling uses mathematical models and runs using lingo software. The results of calculations using LINGO for mathematical models are 14,274 hours with a calculation time of 17 minutes 55 seconds.","PeriodicalId":275027,"journal":{"name":"Universal Journal of Mechanical Engineering","volume":"7 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Parallel Machine Scheduling for Minimizing Flowtime: Case Study at Aircraft Company X Turnin and Milling Departments\",\"authors\":\"Asep Anwar, Didit Damur Rochman\",\"doi\":\"10.13189/UJME.2019.071306\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Company X in 2017 has a delay in the Turning and Milling department of 58% of the total order of 2,334. The actual condition is the number of machines used, namely 5 CNC machines with a production capacity of 230.4 hours / week and the number of work orders from 2013-2018 that must be done is 2767,458 hours. The delay was due to the absence of an appropriate engine scheduling system. Modeling uses mathematical models and runs using lingo software. The results of calculations using LINGO for mathematical models are 14,274 hours with a calculation time of 17 minutes 55 seconds.\",\"PeriodicalId\":275027,\"journal\":{\"name\":\"Universal Journal of Mechanical Engineering\",\"volume\":\"7 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-05-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Universal Journal of Mechanical Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.13189/UJME.2019.071306\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Universal Journal of Mechanical Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.13189/UJME.2019.071306","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

X公司2017年车削部的订单延期量占总订单2334台的58%。实际情况是使用机器数量,即5台CNC机床,生产能力为230.4小时/周,2013-2018年必须完成的工单数量为2767458小时。延误是由于缺乏适当的发动机调度系统。建模使用数学模型,并使用lingo软件运行。使用LINGO计算数学模型的结果为14,274小时,计算时间为17分55秒。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Parallel Machine Scheduling for Minimizing Flowtime: Case Study at Aircraft Company X Turnin and Milling Departments
Company X in 2017 has a delay in the Turning and Milling department of 58% of the total order of 2,334. The actual condition is the number of machines used, namely 5 CNC machines with a production capacity of 230.4 hours / week and the number of work orders from 2013-2018 that must be done is 2767,458 hours. The delay was due to the absence of an appropriate engine scheduling system. Modeling uses mathematical models and runs using lingo software. The results of calculations using LINGO for mathematical models are 14,274 hours with a calculation time of 17 minutes 55 seconds.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信