{"title":"风电并网对加州电力系统调节和负荷跟随要求的影响","authors":"Y. Makarov, C. Loutan, Jian Ma, P. de Mello, Shuai Lu","doi":"10.1109/EEM.2008.4579027","DOIUrl":null,"url":null,"abstract":"This paper describes a methodology to evaluate the amount of required regulation and load following capability to maintain reliability in the CAISO Control Area. The methodology is based on a mathematical model of the CAISOpsilas actual scheduling, real-time dispatch and regulation processes. The forecast load and wind power are stochastic quantities, represented by two series of minute by minute values: the load/wind-power average value and its standard deviation magnitude. The hour-ahead wind generation forecast was assumed to be a part of the future CAISO/scheduling coordinator (SC) scheduling system. CAISO actual 2006 data and simulated 2010 data are analyzed by season. Load following and regulation requirements, including the capacity, ramping, and duration requirements by operating hour within a season of 2006 and 2010 were analyzed simultaneously.","PeriodicalId":118618,"journal":{"name":"2008 5th International Conference on the European Electricity Market","volume":"49 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-05-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"12","resultStr":"{\"title\":\"Impacts of integration of wind generation on regulation and load following requirements of California power systems\",\"authors\":\"Y. Makarov, C. Loutan, Jian Ma, P. de Mello, Shuai Lu\",\"doi\":\"10.1109/EEM.2008.4579027\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper describes a methodology to evaluate the amount of required regulation and load following capability to maintain reliability in the CAISO Control Area. The methodology is based on a mathematical model of the CAISOpsilas actual scheduling, real-time dispatch and regulation processes. The forecast load and wind power are stochastic quantities, represented by two series of minute by minute values: the load/wind-power average value and its standard deviation magnitude. The hour-ahead wind generation forecast was assumed to be a part of the future CAISO/scheduling coordinator (SC) scheduling system. CAISO actual 2006 data and simulated 2010 data are analyzed by season. Load following and regulation requirements, including the capacity, ramping, and duration requirements by operating hour within a season of 2006 and 2010 were analyzed simultaneously.\",\"PeriodicalId\":118618,\"journal\":{\"name\":\"2008 5th International Conference on the European Electricity Market\",\"volume\":\"49 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2008-05-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"12\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2008 5th International Conference on the European Electricity Market\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EEM.2008.4579027\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 5th International Conference on the European Electricity Market","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EEM.2008.4579027","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 12

摘要

本文描述了一种评估在CAISO控制区维持可靠性所需的调节量和负荷跟踪能力的方法。该方法基于CAISOpsilas实际调度、实时调度和调控过程的数学模型。预测负荷和风电均为随机量,由负荷/风电平均值及其标准差量级两组分分钟值序列表示。将小时前风力发电预测作为未来CAISO/调度协调器(SC)调度系统的一部分。CAISO 2006年实际数据和2010年模拟数据按季节进行了分析。同时分析了2006年和2010年一个季节的负荷跟随和调节要求,包括容量、爬坡和按运行小时计算的持续时间要求。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Impacts of integration of wind generation on regulation and load following requirements of California power systems
This paper describes a methodology to evaluate the amount of required regulation and load following capability to maintain reliability in the CAISO Control Area. The methodology is based on a mathematical model of the CAISOpsilas actual scheduling, real-time dispatch and regulation processes. The forecast load and wind power are stochastic quantities, represented by two series of minute by minute values: the load/wind-power average value and its standard deviation magnitude. The hour-ahead wind generation forecast was assumed to be a part of the future CAISO/scheduling coordinator (SC) scheduling system. CAISO actual 2006 data and simulated 2010 data are analyzed by season. Load following and regulation requirements, including the capacity, ramping, and duration requirements by operating hour within a season of 2006 and 2010 were analyzed simultaneously.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信