KEKB超导腔的现状与发展

S. Mitsunobu, K. Asano, Takaaki Furuya, Y. Ishi, Y. Kijima, K. Sennyu, Tsuyoshi Tajima, T. Takahashi, S. Zhao
{"title":"KEKB超导腔的现状与发展","authors":"S. Mitsunobu, K. Asano, Takaaki Furuya, Y. Ishi, Y. Kijima, K. Sennyu, Tsuyoshi Tajima, T. Takahashi, S. Zhao","doi":"10.1109/PAC.1997.753057","DOIUrl":null,"url":null,"abstract":"After successful test of 500 mA (Max 573 mA) electron beam at TRISTAN Accumulation ring (AR) using a prototype superconducting cavity, more than 4 superconducting cavities will be installed in High Energy Ring (HER) of KEK B-factory. The initial 4 superconducting cavities are almost same as the prototype one. The tests and results of the critical components of superconducting cavity system is described.","PeriodicalId":122662,"journal":{"name":"Proceedings of the 1997 Particle Accelerator Conference (Cat. No.97CH36167)","volume":"22 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1997-05-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"9","resultStr":"{\"title\":\"Status and development of superconducting cavity for KEKB\",\"authors\":\"S. Mitsunobu, K. Asano, Takaaki Furuya, Y. Ishi, Y. Kijima, K. Sennyu, Tsuyoshi Tajima, T. Takahashi, S. Zhao\",\"doi\":\"10.1109/PAC.1997.753057\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"After successful test of 500 mA (Max 573 mA) electron beam at TRISTAN Accumulation ring (AR) using a prototype superconducting cavity, more than 4 superconducting cavities will be installed in High Energy Ring (HER) of KEK B-factory. The initial 4 superconducting cavities are almost same as the prototype one. The tests and results of the critical components of superconducting cavity system is described.\",\"PeriodicalId\":122662,\"journal\":{\"name\":\"Proceedings of the 1997 Particle Accelerator Conference (Cat. No.97CH36167)\",\"volume\":\"22 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1997-05-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"9\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the 1997 Particle Accelerator Conference (Cat. No.97CH36167)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PAC.1997.753057\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 1997 Particle Accelerator Conference (Cat. No.97CH36167)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PAC.1997.753057","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 9

摘要

在TRISTAN积累环(AR)上使用原型超导腔成功测试500 mA(最大573 mA)电子束后,KEK b工厂的高能环(HER)将安装4个以上的超导腔。初始的4个超导腔与原型腔基本相同。介绍了超导腔体系统关键部件的试验和结果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Status and development of superconducting cavity for KEKB
After successful test of 500 mA (Max 573 mA) electron beam at TRISTAN Accumulation ring (AR) using a prototype superconducting cavity, more than 4 superconducting cavities will be installed in High Energy Ring (HER) of KEK B-factory. The initial 4 superconducting cavities are almost same as the prototype one. The tests and results of the critical components of superconducting cavity system is described.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信