使用ISO 31000框架分析软件开发项目的风险

Amin Maruf Nuris, Aditya Maharani, Renanda Nia Rachmadita
{"title":"使用ISO 31000框架分析软件开发项目的风险","authors":"Amin Maruf Nuris, Aditya Maharani, Renanda Nia Rachmadita","doi":"10.25170/metris.v22i02.2800","DOIUrl":null,"url":null,"abstract":"PT. Duta Media Cipta (DMC) is a control system and IT company based in the city of Surabaya, this company focuses on procurement, maintenance and repair services for ship equipment, both mechanical and electrical. As an information technology company, PT. DMC is committed to being a trusted IT and control system company. In working on the project, PT. DMC has not implemented risk management for every software development project it has worked on. Some of the risks that are often faced in working on software projects at PT. DMC are project risks such as technical, cost, and project scheduling which are sometimes not in accordance with the established plan and cause cost and time losses to the company. So in this study using ISO 31000 as a framework in analyzing potential risks. The application of risk assessment consists of 3 stages, namely risk identification, risk analysis, and risk evaluation. The results of this study found that there are 4 risks with 26 sub-risks, of which there are 6 sub-risks that are prioritized and require risk management.","PeriodicalId":402087,"journal":{"name":"Jurnal METRIS","volume":"34 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-02-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Analisis Risiko Proyek Pengembangan Perangkat Lunak Menggunakan Kerangka Kerja ISO 31000\",\"authors\":\"Amin Maruf Nuris, Aditya Maharani, Renanda Nia Rachmadita\",\"doi\":\"10.25170/metris.v22i02.2800\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"PT. Duta Media Cipta (DMC) is a control system and IT company based in the city of Surabaya, this company focuses on procurement, maintenance and repair services for ship equipment, both mechanical and electrical. As an information technology company, PT. DMC is committed to being a trusted IT and control system company. In working on the project, PT. DMC has not implemented risk management for every software development project it has worked on. Some of the risks that are often faced in working on software projects at PT. DMC are project risks such as technical, cost, and project scheduling which are sometimes not in accordance with the established plan and cause cost and time losses to the company. So in this study using ISO 31000 as a framework in analyzing potential risks. The application of risk assessment consists of 3 stages, namely risk identification, risk analysis, and risk evaluation. The results of this study found that there are 4 risks with 26 sub-risks, of which there are 6 sub-risks that are prioritized and require risk management.\",\"PeriodicalId\":402087,\"journal\":{\"name\":\"Jurnal METRIS\",\"volume\":\"34 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-02-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal METRIS\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.25170/metris.v22i02.2800\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal METRIS","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.25170/metris.v22i02.2800","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

PT. Duta Media Cipta (DMC)是一家位于泗水市的控制系统和IT公司,该公司专注于船舶机械和电气设备的采购,维护和维修服务。作为一家信息技术公司,PT. DMC致力于成为一家值得信赖的IT和控制系统公司。在项目中,PT. DMC并没有对它所从事的每个软件开发项目实施风险管理。在PT. DMC从事软件项目时经常面临的一些风险是项目风险,如技术风险、成本风险和项目进度风险,这些风险有时与既定计划不一致,给公司造成成本和时间损失。因此在本研究中使用ISO 31000作为分析潜在风险的框架。风险评估的应用包括风险识别、风险分析和风险评价三个阶段。本研究结果发现,有4个风险,26个子风险,其中有6个子风险是优先级,需要进行风险管理。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Analisis Risiko Proyek Pengembangan Perangkat Lunak Menggunakan Kerangka Kerja ISO 31000
PT. Duta Media Cipta (DMC) is a control system and IT company based in the city of Surabaya, this company focuses on procurement, maintenance and repair services for ship equipment, both mechanical and electrical. As an information technology company, PT. DMC is committed to being a trusted IT and control system company. In working on the project, PT. DMC has not implemented risk management for every software development project it has worked on. Some of the risks that are often faced in working on software projects at PT. DMC are project risks such as technical, cost, and project scheduling which are sometimes not in accordance with the established plan and cause cost and time losses to the company. So in this study using ISO 31000 as a framework in analyzing potential risks. The application of risk assessment consists of 3 stages, namely risk identification, risk analysis, and risk evaluation. The results of this study found that there are 4 risks with 26 sub-risks, of which there are 6 sub-risks that are prioritized and require risk management.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信