{"title":"Bersimis II电厂平面图布置-设备说明","authors":"G. Ransom","doi":"10.1109/AIEEPAS.1962.4501383","DOIUrl":null,"url":null,"abstract":"A plant designer's view of an outdoor 850,000-hp (horsepower) hydroelectric plant in northeastern Quebec is presented. Twelve-foot spherical penstock valves have double seals. Steel scroll cases for the 171,000-hp turbines were completely assembled by welding in the field. Generators have self-lubricated bearings without oil lift for starting. Highspeed regulators provide for charging of long lines. A 6,000-amp (ampere) 15-kv isolated-phase bus is employed. Transformers step up to 300 kv. Control protection, station service, and accessory equipment are described.","PeriodicalId":118797,"journal":{"name":"Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems","volume":"70 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1962-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Bersimis II Powerkouse Plan Arrangement-Description of Apparatus\",\"authors\":\"G. Ransom\",\"doi\":\"10.1109/AIEEPAS.1962.4501383\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A plant designer's view of an outdoor 850,000-hp (horsepower) hydroelectric plant in northeastern Quebec is presented. Twelve-foot spherical penstock valves have double seals. Steel scroll cases for the 171,000-hp turbines were completely assembled by welding in the field. Generators have self-lubricated bearings without oil lift for starting. Highspeed regulators provide for charging of long lines. A 6,000-amp (ampere) 15-kv isolated-phase bus is employed. Transformers step up to 300 kv. Control protection, station service, and accessory equipment are described.\",\"PeriodicalId\":118797,\"journal\":{\"name\":\"Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems\",\"volume\":\"70 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1962-04-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/AIEEPAS.1962.4501383\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Transactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/AIEEPAS.1962.4501383","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Bersimis II Powerkouse Plan Arrangement-Description of Apparatus
A plant designer's view of an outdoor 850,000-hp (horsepower) hydroelectric plant in northeastern Quebec is presented. Twelve-foot spherical penstock valves have double seals. Steel scroll cases for the 171,000-hp turbines were completely assembled by welding in the field. Generators have self-lubricated bearings without oil lift for starting. Highspeed regulators provide for charging of long lines. A 6,000-amp (ampere) 15-kv isolated-phase bus is employed. Transformers step up to 300 kv. Control protection, station service, and accessory equipment are described.