{"title":"基于路径浮动的项目计划调度中时间成本权衡优化方法","authors":"S. Nasiri, Ming Lu","doi":"10.1061/9780784482421.074","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":288285,"journal":{"name":"Computing in Civil Engineering 2019","volume":"167 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-06-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Path-Float Based Approach to Optimizing Time-Cost Tradeoff in Project Planning and Scheduling\",\"authors\":\"S. Nasiri, Ming Lu\",\"doi\":\"10.1061/9780784482421.074\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":288285,\"journal\":{\"name\":\"Computing in Civil Engineering 2019\",\"volume\":\"167 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-06-13\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Computing in Civil Engineering 2019\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1061/9780784482421.074\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Computing in Civil Engineering 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1061/9780784482421.074","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}