基于时效性的最优检测间隔关联延迟时间模型

R. Jiang
{"title":"基于时效性的最优检测间隔关联延迟时间模型","authors":"R. Jiang","doi":"10.1109/PHM.2012.6228965","DOIUrl":null,"url":null,"abstract":"The delay-time concept has been widely applied to prevent failure of an item with a deteriorating failure mode by implementing a periodic inspection scheme. The inspection interval is usually optimized based on a cost rate model, and the optimal solution is sensitive to the cost parameters so that the cost model can be inappropriate for the situation where the cost parameters are hard to be accurately determined. In this paper, an inspection timeliness measure is defined, which is the expected time between the last inspection and the item failure. The measure reflects the timeliness of inspections and is a function of inspection interval. There exists an optimal inspection interval where the timeliness measure achieves its minimum. This timeliness-based optimal inspection interval can be obtained using Monte Carlo simulation approach. The proposed approach is illustrated by an example.","PeriodicalId":444815,"journal":{"name":"Proceedings of the IEEE 2012 Prognostics and System Health Management Conference (PHM-2012 Beijing)","volume":"29 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-05-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"A timeliness-based optimal inspection interval associated with the delay time model\",\"authors\":\"R. Jiang\",\"doi\":\"10.1109/PHM.2012.6228965\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The delay-time concept has been widely applied to prevent failure of an item with a deteriorating failure mode by implementing a periodic inspection scheme. The inspection interval is usually optimized based on a cost rate model, and the optimal solution is sensitive to the cost parameters so that the cost model can be inappropriate for the situation where the cost parameters are hard to be accurately determined. In this paper, an inspection timeliness measure is defined, which is the expected time between the last inspection and the item failure. The measure reflects the timeliness of inspections and is a function of inspection interval. There exists an optimal inspection interval where the timeliness measure achieves its minimum. This timeliness-based optimal inspection interval can be obtained using Monte Carlo simulation approach. The proposed approach is illustrated by an example.\",\"PeriodicalId\":444815,\"journal\":{\"name\":\"Proceedings of the IEEE 2012 Prognostics and System Health Management Conference (PHM-2012 Beijing)\",\"volume\":\"29 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2012-05-23\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the IEEE 2012 Prognostics and System Health Management Conference (PHM-2012 Beijing)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PHM.2012.6228965\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the IEEE 2012 Prognostics and System Health Management Conference (PHM-2012 Beijing)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PHM.2012.6228965","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

延迟时间概念已被广泛应用于通过实施定期检查方案来防止失效模式恶化的项目失效。检查间隔通常基于成本率模型进行优化,而最优解对成本参数比较敏感,使得成本模型不适用于成本参数难以准确确定的情况。本文定义了检验时效性度量,即从上次检验到项目失效之间的预期时间。该指标反映了检查的及时性,是检查间隔的函数。存在一个最优检查间隔,使时效性度量达到最小值。这种基于时效性的最优检测间隔可以通过蒙特卡洛仿真方法得到。通过一个实例说明了所提出的方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A timeliness-based optimal inspection interval associated with the delay time model
The delay-time concept has been widely applied to prevent failure of an item with a deteriorating failure mode by implementing a periodic inspection scheme. The inspection interval is usually optimized based on a cost rate model, and the optimal solution is sensitive to the cost parameters so that the cost model can be inappropriate for the situation where the cost parameters are hard to be accurately determined. In this paper, an inspection timeliness measure is defined, which is the expected time between the last inspection and the item failure. The measure reflects the timeliness of inspections and is a function of inspection interval. There exists an optimal inspection interval where the timeliness measure achieves its minimum. This timeliness-based optimal inspection interval can be obtained using Monte Carlo simulation approach. The proposed approach is illustrated by an example.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信